| Order, ERC Case No. 2020-013 MC, IN THE MATTER OF THE APPLICATION FOR THE APPLICATION OF THE NATIONAL GRID CORPORATION OF THE PHILIPPINES' BUSINESS SEPARATION AND UNBUNDLING PLAN (BSUP) AND ACCOUNTING AND COST ALLOCATION MANUAL (ACAM) WITH MOTION FOR CONFIDENTIAL TREATMENT OF INFORMATION AND ISSUANCE OF A PROTECTIVE ORDER - NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP), Applicant Date Docketed:6/1/2023 Published: 6/1/2023 |

| Initial Order, ERC Case No. 2023-050 RC, IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE ANCILLARY SERVICES PROCUREMENT AGREEMENT BETWEEN THE NATIONAL GRID CORPORATION OF THE PHILIPPINES AND THERMA VISAYAS, INC., WITH PRAYER FOR THE ISSUANCE OF PROVISIONAL AUTHORITY - NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) AND THERMA VISAYAS, INC. (TVI), Applicants Date Docketed:5/30/2023 Published: 5/30/2023 |

| Order, ERC Case No. 2022-089 RC, IN THE MATTER OF THE APPLICATION OF THE MAXIMUM ANNUAL REVENUE FOR THE FOURTH REGULATORY PERIOD (2016 TO 2020) OF THE NATIONAL GRID CORPORATION OF THE PHILIPPINES IN ACCORDANCE WITH THE ALTERNATIVE FORM OF RATE SETTING METHODOLOGY UNDER THE RULES IN SETTING THE TRANSMISSION WHEELING RATES WITH PRAYER FOR CONFIDENTIAL TREATMENT OF INFORMATION – NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP), Applicant Date Docketed:5/24/2023 Published: 5/24/2023 |

| Order, ERC Case No. 2017-010 RM, In the Matter of the Petition for the Adoption of the Proposed Amendments to the 2006 Open Access Transmission Services Rules (OATS RULES), National Grid Corporation of the Philippines (NGCP), Petitioner Date Docketed:5/24/2023 Published: 5/24/2023 |

| Initial Order, ERC Case No. 2023-010 MC, IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO DEVELOP, OWN AND OPERATE A DEDICATED POINT-TO-POINT LIMITED TRANSMISSION LINE TO CONNECT THE 60 MW KAPANGAN HYDRO ELECTRIC POWER PLANT TO THE 69 KV BACNOTAN SUBSTATION OF THE NATIONAL GRID CORPORATION OF THE PHILIPPINES, WITH PRAYER FOR PROVISIONAL AUTHORITY – CORDILLERA HYDRO ELECTRIC POWER CORPORATION (COHECO), Applicant Date Docketed:5/19/2023 Published: 5/19/2023 |

| Order, ERC Case No. 2022-029 MC, IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO DEVELOP, OWN, AND/OR OPERATE A DEDICATED POINT-TO-POINT LIMITED FACILITIES TO CONNECT THE ±24 MW MAGAT BATTERY ENERGY STORAGE SYSTEM TO THE LUZON GRID, THROUGH DIRECT CONNECTION TO THE EXISTING MAGAT 230 KV SWITCHYARD, LOCATED IN BARANGAY GENERAL AGUINALDO, RAMON, ISABELA, PHILIPPINES, WITH PRAYER FOR PROVISIONAL AUTHORITY AND/OR INTERIM RELIEF AND CONFIDENTIAL TREATMENT OF INFORMATION – SN ABOITIZ POWER-MAGAT, INC. Applicant Date Docketed:5/15/2023 Published: 5/15/2023 |

| Order, ERC Case No. 2022-129 SC to 2022-131 SC, In Re: Violation of Department of Energy (DOE) Department Circular No. DC 2021-10-0031, (Violation: Failure to comply with Section 4.2 of the DOE Department Circular No. DC2021-10-0031), (Violation: Failure to comply with Sections 7.4 and 7.5 of the DOE Department Circular No. DC2021-10-0031), and (Violation: Failure to comply with Sections 7.1 and 7.11 of the DOE Department Circular No. DC2021-10-0031), National Grid Corporation of the Philippines (NGCP), Respondent Date Docketed:4/17/2023 Published: 4/17/2023 |

| Order, ERC Case No. 2022-089 RC, IN THE MATTER OF THE APPLICATION OF THE MAXIMUM ANNUAL REVENUE FOR THE FOURTH REGULATORY PERIOD (2016 TO 2020) OF THE NATIONAL GRID CORPORATION OF THE PHILIPPINES IN ACCORDANCE WITH THE ALTERNATIVE FORM OF RATE SETTING METHODOLOGY UNDER THE RULES IN SETTING THE TRANSMISSION WHEELING RATES WITH PRAYER FOR CONFIDENTIAL TREATMENT OF INFORMATION – NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP), Applicant. Date Docketed:4/13/2023 Published: 4/13/2023 |


| Order, ERC Case No. 2010-064 MC, IN THE MATTER OF THE PETITION FOR RECLASSIFICATION OF THE CEDC-COLON 138 KV LINE OF VISAYAN ELECTRIC COMPANY, INC., FROM A CONNECTION ASSET TO TRANSMISSION ASSET NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) Petitioner, -versus- VISAYAN ELECTRIC COMPANY, INC. (VECO), Respondent Date Docketed:4/13/2023 Published: 4/13/2023 |


| Order, ERC Case No. 2023-011 MC, IN THE MATTER OF THE COMMISSION'S EXERCISE OF ITS REGULATORY POWERS TO RATIONALIZE THE MARKET PRICES FOR THE AREAS AFFECTED BY CEBU-MANDAUE TRANSMISSION LINE 2 DAMAGE UNTIL REPAIRS THEREON ARE COMPLETED Date Docketed:3/29/2023 Published: 3/29/2023 |