| Decision, ERC Case No. 2021-026 MC, In the Matter of the Application for Authority to Develop, Own and/or Operate Dedicated Point-To-Point Limited Transmission Facilities to Connect the ±60MW Concepcion Battery Energy Storage System to the Luzon Grid via the Concepcion 69kV Substation of the National Grid Corporation of the Philippines, with Prayer for Provisional Authority and/or Interim Relief and Confidential Treatment of Information, Universal Power Solutions, Inc. (UPSI) applicant Date Docketed:6/27/2022 Published: 6/27/2022 |

| Decision, ERC Case No. 2021-023 MC, In the Matter of the Application for Authority to Develop, Own and Operate Dedicated Point-to-Point Limited Transmission Facilities Connecting the 51.9 MW Northwind Bangui Bay Wind Power Project to the Luzon Grid via the Laoag Substation of the National Grid Corporation of the Philippines (NGCP), with Motion for Provisional Authority or Interim Relief, Northwind Power Development Corporation (NORTHWIND) applicant Date Docketed:6/20/2022 Published: 6/20/2022 |


| Decision, ERC Case Nos. 2021-075 SC, 2021-076 SC and 2021-077 SC, In Re: Violation of Article V of ERC Resolution No. 10, Series of 2020, Hydro Electric Development Corporation Bukidnon, Inc. (HEDCOR, Bukidnon, Inc.) respondent Date Docketed:6/15/2022 Published: 6/15/2022 |

| Decision, ERC Case No. 2011-062 RC, In the Matter of the Application for Approval of the Ancillary Services Procurement Agreement (ASPA) Between the National Grid Corporation of the Philippines and First Gen Hydro Power Corporation, with Prayer for Provisional Authority, National Grid Corporation of the Philippines (NGCP) and First Gen Hydro Power Corporation (FGHPC) applicants Date Docketed:6/15/2022 Published: 6/15/2022 |

| Decision, ERC Case No. 2017-022 RC, In the Matter of the Application for Approval of the Proposed Electric Capital Projects for the Year 2017-2019, Tarlac II Electric Cooperative, Inc. (TARELCO II) applicant Date Docketed:6/15/2022 Published: 6/15/2022 |

| Decision, ERC Case No. 2020-018 RC, In the Matter of the Application for Confirmation and Approval of Force Majeure Event Capital Expenditure Project, Namely; Repair and Rehabilitation of Distribution Lines, Massive Replacement and Rehabilitation of Kilowatt-Hour Meters and Service Drop Materials, and Repair of Building and Service Vehicle in the Areas Affected by the Onslaught of Typhoon Ursula, Iloilo III Electric Cooperative Inc. (ILECO III) applicant Date Docketed:6/10/2022 Published: 6/10/2022 |

| Decision, ERC Case No. 2018-024 SC, In Re: Violation of Resolution No. 24, Series of 2011 (Non-submission of URR), Misamis Oriental I Electric Cooperative, Inc. (MORESCO I) respondent Date Docketed:6/8/2022 Published: 6/8/2022 |


| Decision, ERC Case No. 2009-162 CC, Lorna C. Tayamen complainant versus Manila Electric Company (MERALCO) respondent Date Docketed:6/8/2022 Published: 6/8/2022 |

| Decision, ERC Case No. 2017-073 RC, In the Matter of the Application for Approval of the Multi-Year Capital Expenditure Projects (2015-2017) with Prayer for Authority to Secure Loans and Provisional Authority, Negros Oriental I Electric Cooperative, Inc. (NORECO I) applicant Date Docketed:6/3/2022 Published: 6/3/2022 |

| Decision, ERC Case No. 2019-060 RC, In the Matter of the Application for Confirmation and Approval of Emergency Capital Expenditure Projects for 2019, Namely: Purchase and Installation of Brand New 20 MVA Substation at Bahay, Libmanan, Camarines Sur and Construction of 69KV Subtransmission Line from NGCP Tapping Point at Bahay, Libmanan to the New 20 MVA Libmanan Substation, Camarines Sur I Electric Cooperative, Inc. (CASURECO I) applicant Date Docketed:6/3/2022 Published: 6/3/2022 |