Decision, ERC Case Nos. 2022-129 SC, 2022-130 SC and 2022-131 SC, IN RE: VIOLATIONS OF DEPARTMENT OF ENERGY (DOE) DEPARTMENT CIRCULAR NO. DC 2021-10- 0031 [ VIOLATION: Failure to comply with Section 4.2 of the DOE Department Circular No. DC 2021-10-0031, VIOLATION: Failure to comply with Section 7.4 and 7.5 of the DOE Department Circular No. DC 2021-10- 0031, VIOLATION: Failure to comply with Sections 7.1 and 7.11 of the DOE Department Circular No. DC 2021-10- 0031], National Grid Corporation of the Philippines (NGCP), respondent
Date Docketed:10/27/2022
Published: 10/27/2022



Decision, ERC Case No. 2010-139 CC, Ruben Casquejo, complainant versus Manila Electric Company (MERALCO) respondent
Date Docketed:10/5/2022
Published: 10/5/2022



Decision, ERC Case No. 2014-054 CC, Ester Calica, complainant versus Manila Electric Company (MERALCO) respondent
Date Docketed:10/5/2022
Published: 10/5/2022


Decision, ERC Case No. 2022-008 MC, In the Matter of the Application for Authority to Develop, Own and/or Operate Dedicated Point-to-Point Limited Facilities to Connect the +60MW Pitogo Battery Energy Storage System to the Mindanao Grid, Through the 138kV Pitogo Substation Owned by the National Grid Corporation of the Philippines with Prayer for Provisional Authority and/or Interim Relief and Confidential Treatment of Information, Fort Pilar Energy, Inc., applicant
Date Docketed:9/7/2022
Published: 9/7/2022


Decision, ERC Case No. 2015-033 RC, In the Matter of the Joint Application for the Approval of the Electric Power Purchase Agreement (EPPA) Entered Into by and Between First Bukidnon Electric Cooperative, Inc. (FIBECO) and FDC Misamis Power Corporation (FDC Misamis), with Prayer for Issuance of Provisional Authority (PA), First Bukidnon Electric Cooperative, Inc. (FIBECO) and FDC Misamis Power Corporation (FDC Misamis) applicants
Date Docketed:8/5/2022
Published: 8/5/2022


Decision, ERC Case No. 2015-034 RC, In the Matter of the Joint Application for the Approval of the Electric Power Purchase Agreement (EPPA) Entered Into by and Between Cotabato Electric Cooperative, Inc. (COTELCO) and FDC Misamis Power Corporation (FDC Misamis), with Prayer for Issuance of Provisional Authority (PA), Cotabato Electric Cooperative, Inc. (COTELCO) and FDC Misamis Power Corporation (FDC Misamis) applicants
Date Docketed:8/5/2022
Published: 8/5/2022


Decision, ERC Case No. 2018-019 MC, In the Matter of the Application for the Issuance of a Certificate of Public Convenience and Necessity for the Operation of the Electric Distribution System for Iloilo City, with a Prayer for Provisional Authority, More Electric and Power Corporation (MORE) applicant
Date Docketed:8/5/2022
Published: 8/5/2022


Decision, ERC Case Nos. 2013-010 CF, 2016-003 CF and 2019-022 CF, In the Matter of the Application for Confirmation & Approval of Calculations of Over or Under Recoveries in the Implementation of Automatic Cost Adjustments and True Up Mechanisms Pursuant to ERC Resolution No. 16, Series of 2009 as Amended by Resolution No. 21, Series of 2010, Sultan Kudarat Electric Cooperative, Inc. (SUKELCO) applicant
Date Docketed:7/8/2022
Published: 7/8/2022


Decision, ERC Case No. 2021-024 MC, In the Matter of the Application for Authority to Develop, Own and Operate Dedicated Point-to-Point Facility to Connect the 23.31 MW Diesel Power Plant to the Connection Point of Bantayan Island Electric Cooperative, Inc. (BANELCO) in Barangay Bantique, Bantayan , Isla Norte Energy Corporation (INEC) applicant
Date Docketed:7/8/2022
Published: 7/8/2022


Decision, ERC Case No. 2020-043 RC. In the Matter of the Application for: (A) Confirmation of the True-Up Calculation of the Actual Weighted Average Tariff (Awat) Vis-À-Vis Erc-Approved Average Rate Implemented for the Lapsed Regulatory Years; And (B) Approval of the Final Refund Scheme to Account for the Lapsed Regulatory Years, with Prayer for Provisional Authority Manila Electric Company (Meralco), Applicant.
Date Docketed:7/5/2022
Published: 7/5/2022

12345678910...>>

Issuances

A compilation of ERC guidelines, rules, regulations, procedures, decisions, orders and resolutions. For other issuances not included in this section, please contact the Office of General Counsel and Secretariat at tel. no. (02) 8631-5806, or our Central Records Division at cell no. 0981-1606286; E-mail: docket@erc.ph

Today at ERC
Sunday, December 4, 2022

Hearing Schedules
No Hearing!

© 2022 - Energy Regulatory Commission