Republic of the Philippines

ENERGY REGULATORY COMMISSION

A world class and independent electric power industry regulator that equitably promotes and protects the interests of consumers and other stakeholders, to enable the delivery of long-term benefits that contribute to sustained economic growth and an improved quality of life.


ERC Releases Preliminary GEAR Prices for Round 2 of the Auction

28 April 2023/ERC-Planning and Public Information Service

PASIG CITY - The Energy Regulatory Commission (ERC), on 28 April 2023, released the Preliminary Green Energy Auction Reserve (GEAR) Prices for the Round 2 of the Green Energy Auction that will be conducted by the Department of Energy (DOE), for the following technologies:


Renewable Energy Resource

Proposed GEAR2 Price (PhP/kWh)

Rooftop Solar

4.7156

Ground-mounted Solar

4.2395

Floating Solar

4.7565

Wind

5.9823

Biomass

5.1475


Preliminary GEAR Price for Waste-to-Energy, on the other hand, will be posted at a later time prior to the commencement of the public consultations.

The issuance is pursuant to DOE’s Department Circular No. DC 2021-11-0036, Providing the Revised Guidelines for the Green Energy Auction Program (GEAP) in the Philippines, where the ERC shall determine the GEAR Prices which are the maximum price offers in PhP/kWh that shall be used as the ceiling price in the auction.

The said GEAR prices or ceiling prices are applicable to the following capacities, as indicated in the Notice of Auction for the 2nd Round of GEAP, published by the DOE on 27 March 2023:


2024

(in MW)

2025

(in MW)

2026

(in MW)

TOTAL

(in MW)

Solar - Ground

2,025

2,140

2,550

6,715

Solar - Roof

235

260

110

605

Solar- Floating

-

-

300

300

Wind- on shore

1,200

1,170

1,350

3,720

Biomass

140

30

60

230

WTE

-

-

30

30

TOTAL

3,600

3,600

4,400

11,600


The ERC shall be accepting comments on the Preliminary GEAR Prices until 05 May 2023 and will conduct Public Consultation in Luzon, Visayas and Mindanao with the following schedules:

Date and Time

Particulars

Venue

11 May 2023

(Thursday)

9:00 A.M.

Public Consultation for Luzon Stakeholders

ERC Hearing Room, 11th Floor Exquadra Tower, 1 Jade Drive, Ortigas, Pasig City

15 May 2023

(Monday)

9:00 A.M.

Public Consultation for Visayas Stakeholders

ERC Visayas Area Operations Division (VAOD)

7th Floor Kepwealth Building, Samar Loop, Cebu Business Park, Cebu City

16 May 2023

(Tuesday)

9:00 A.M.

Public Consultation for Mindanao Stakeholders

ERC Mindanao Area Operations Division (MAOD)

Rm. 6F-9 6th floor, BIZ Building, Bormaheco Inc.

209 J.P.Laurel Ave., Bajada, Davao City


 


© 2023 - Energy Regulatory Commission