Notice of Public Hearing, ERC Case No. 2019-021 MC

In the Matter of the Application for Authority to Develop and Own or Operate Dedicated Point - to - Point Limited Facilities to Connect VS Gripal Power Corporation's (VSGPC) 6 MW Biomass Power Plant Project to the National Grid Corporation of the Philippines' Luzon Gird Through Tap Connection to the Existing Cabanatuan - Pantabangan 69 KV Line, with Prayer for Provisional Authority or Interim Relief, VS Gripal Power Corporation (VSGPC) applicant
NOPH_2019-021MC
InitialOrder_2019-021MC

 

Today at ERC
Tuesday, November 12, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-001 DR [EV]
Applicant:
CPGI
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Petition for Full Recovery for Approved Costs in ERC Case No. 2011-030 RC Through Re-Computation of Approved Rate
Time:
14:00
Case No.:
2016-149 RC [CH]
Applicant:
PSALM
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the 6th Application for the True Up Adjustments of Fuel and Purchased Power Costs (TAFPPC), and Foreign Exchange - Related Costs (TAFxA) under the Rules of the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange Related Cost by the National Power Corporation, as Amended
Time:
14:00
Case No.:
2017-007 MC [CI]
Applicant:
Catuiran Hydropower Corporation (CHC)
Venue:
LS Conference Area (15th floor)
Title:
In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point to Point Limited Transmission Line to Connect the 8 MW Catuiran Mini Hydro Plant to ORMECOs 69 kV System