Republic of the Philippines

ENERGY REGULATORY COMMISSION

A world class and independent electric power industry regulator that equitably promotes and protects the interests of consumers and other stakeholders, to enable the delivery of long-term benefits that contribute to sustained economic growth and an improved quality of life.


NOTICE: Proposed Draft Rules for Setting the Distribution System Loss Cap and Establishing Performance Incentive Scheme for Distribution Efficiency

Notice is hereby given that there will be a public consultation on the proposed Draft Rules for Setting the Distribution System Loss Cap and Establishing Performance Incentive Scheme for Distribution Efficiency

The public consultations will be conducted as shown in the table below:

STAKEHOLDERS

Date of Public Consultation

Venue

South Luzon

May 29, 2017

ERC Hearing Room, 8th Floor Pacific Center Bldg., San Miguel Avenue, Pasig City

North Luzon

May 30, 2017

Visayas

June 01, 2017

Summit Circle Cebu

Fuente OsmeƱa Circle, Cebu City

Mindanao

June 02, 2017

The Ritz Hotel at Garden Oases

Porras St. Cor. Villamor St., Barrio Obrero, Davao City

All interested parties may submit their comments using the attached template on or before May 23, 2017. Electronic copies may be sent to standards@erc.gov.ph. The said Draft Rules may also be downloaded at www.erc.gov.ph or photocopied at cost at the ERC Main Office Docket Section at the 18th Floor, Pacific Center Building, San Miguel Avenue, Pasig City.

Finally, the Distribution Management Committee (DMC) will be assisting the Commission in organizing said public consultations. Interested parties who wish to attend the same may contact DMC at (02)706-2355 or info@dmc.org.ph.

DraftRulesforSettingtheDistribution.pdf
CommentsSystemLoss.pdf

 

Today at ERC
Wednesday, November 13, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-021 RC [PT] [EV]
Applicant:
NPC
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Petition for the Availment of the Environmental Charge / Share from the Universal Charge for the Rehabilitation and Management of Watershed Areas (Plan 16)
Time:
10:00
Case No.:
2019-017 MC [JU] [EX] [PT] [EV]
Applicant:
BISCOM
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Application for Authority to Develop, Own, and Operate, and Maintain Dedicated Point-to-Point Limited Facilities to Connect to the Transmission System of National Grid Corporation of the Philippines (NGCP), with Prayer for Provisional Authority
Time:
10:00
Case No.:
2019-060 RC [JU] [EX] [PT] [EV]
Applicant:
CASURECO I
Venue:
CASURECO I's Main Office, Puro Batia, Libmanan, Camarines Sur
Title:
In the Matter of the Application for Confirmation and Approval of Emergency Capital Expenditure Projects for 2019, Namely: Purchase and Installation of Brand New 20 MVA Substation at Bahay, Libmanan, Camarines Sur and Construction of 69KV Subtransmission Line from NGCP Tapping Point at Bahay, Libmanan to the New 20 MVA Libmanan Substation
Time:
14:00
Case No.:
2019-069 RC [JU] [EX]
Applicant:
NPC
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Petition for the Approval of the Availment from the Universal Charge for Missionary Electrification (UCME) for CY 2020 with Prayer for the Issuance of Provisional Authority

© 2019 - Energy Regulatory Commission