Republic of the Philippines

ENERGY REGULATORY COMMISSION

A world class and independent electric power industry regulator that equitably promotes and protects the interests of consumers and other stakeholders, to enable the delivery of long-term benefits that contribute to sustained economic growth and an improved quality of life.


NOTICE OF PROPOSED RULE-MAKING, ERC Case No. 2015-002 RM

In the Matter of the Adoption of the Amendment to Resolution No. 10, Series of 2012, entitled " A Resolution Approving theĀ  Feed in Tariff (FIT) Rates" (FIT Rules), Particularly for Wind FIT Rates, as Necessitated by the Review and Re-Adjustment of the Wind FIT Since the Installation Target for Wind Technology has Already Been Achieved

NPR, ERC Case No. 2015-002 RM
Order, ERC Case No. 2015-002 RM

 

Today at ERC
Tuesday, November 12, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-001 DR [EV]
Applicant:
CPGI
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Petition for Full Recovery for Approved Costs in ERC Case No. 2011-030 RC Through Re-Computation of Approved Rate
Time:
14:00
Case No.:
2016-149 RC [CH]
Applicant:
PSALM
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the 6th Application for the True Up Adjustments of Fuel and Purchased Power Costs (TAFPPC), and Foreign Exchange - Related Costs (TAFxA) under the Rules of the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange Related Cost by the National Power Corporation, as Amended
Time:
14:00
Case No.:
2017-007 MC [CI]
Applicant:
Catuiran Hydropower Corporation (CHC)
Venue:
LS Conference Area (15th floor)
Title:
In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point to Point Limited Transmission Line to Connect the 8 MW Catuiran Mini Hydro Plant to ORMECOs 69 kV System

© 2019 - Energy Regulatory Commission