NOTICE OF INITIAL PUBLIC HEARING, ERC Case No. 2013-216 RC, In the Matter of the Application for the Approval of the Power Supply Agreement Between Cabanatuan Electric Corporation (CELCOR) and SN Aboitiz Power-Benguet, Inc. (SNAP-BI), with Prayer for Issuance of a Provisional Authority, Cabanatuan Electric Corporation (CELCOR) and SN Aboitiz Power-Benguet, Inc. (SNAP-BI) applicants [Archive-293]

Order, ERC Case No. 2013-216 RC

Date Published: 12/5/2013

 

Today at ERC
Tuesday, November 12, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-001 DR [EV]
Applicant:
CPGI
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Petition for Full Recovery for Approved Costs in ERC Case No. 2011-030 RC Through Re-Computation of Approved Rate
Time:
14:00
Case No.:
2016-149 RC [CH]
Applicant:
PSALM
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the 6th Application for the True Up Adjustments of Fuel and Purchased Power Costs (TAFPPC), and Foreign Exchange - Related Costs (TAFxA) under the Rules of the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange Related Cost by the National Power Corporation, as Amended
Time:
14:00
Case No.:
2017-007 MC [CI]
Applicant:
Catuiran Hydropower Corporation (CHC)
Venue:
LS Conference Area (15th floor)
Title:
In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point to Point Limited Transmission Line to Connect the 8 MW Catuiran Mini Hydro Plant to ORMECOs 69 kV System