Republic of the Philippines

ENERGY REGULATORY COMMISSION

A world class and independent electric power industry regulator that equitably promotes and protects the interests of consumers and other stakeholders, to enable the delivery of long-term benefits that contribute to sustained economic growth and an improved quality of life.


Invitation to Comment on the DMC Draft Rules to Govern the Monitoring of Compliance of Distribution Utilities to the Philippine Grid Code and the Philippine Distribution Code [Archive-103]

Notice is hereby given that the Distribution Management Committee (DMC) in coordination with the Energy Regulatory Commission (ERC) proposed the “Rules to Govern the Monitoring of Compliance of Distribution Utilities to the Philippine Grid Code and the Philippine Distribution Code”.

The draft Rules is posted at www.erc.gov.ph and www.gmcdmc.ph  for comment. The schedule of expository hearings and public consultation will be posted later.

All interested parties may submit their comments (in both hard and soft copies) on the draft Rules to the DMC Office at the 20th Floor Pacific Center Building, San Miguel Ave., Pasig City on or before October 1, 2010. Electronic copies may be sent to dmcrules@gmcdmc.ph.

Date Published: 8/20/2010

 

Today at ERC
Tuesday, November 12, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-001 DR [EV]
Applicant:
CPGI
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Petition for Full Recovery for Approved Costs in ERC Case No. 2011-030 RC Through Re-Computation of Approved Rate
Time:
14:00
Case No.:
2016-149 RC [CH]
Applicant:
PSALM
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the 6th Application for the True Up Adjustments of Fuel and Purchased Power Costs (TAFPPC), and Foreign Exchange - Related Costs (TAFxA) under the Rules of the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange Related Cost by the National Power Corporation, as Amended
Time:
14:00
Case No.:
2017-007 MC [CI]
Applicant:
Catuiran Hydropower Corporation (CHC)
Venue:
LS Conference Area (15th floor)
Title:
In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point to Point Limited Transmission Line to Connect the 8 MW Catuiran Mini Hydro Plant to ORMECOs 69 kV System

© 2019 - Energy Regulatory Commission