Notice of Public Consultation on the draft "Rules For Contestability" [Archive-29]

Notice is herby given that the draft "Rules for Contestability" is scheduled for public consultation on July 4, 2007 at two o'clock (2:00PM) to five o'clock (5:00PM) in the afternoon at the ERC Hearing Room, 15th Floor, Pacific Center Building, San Miguel Avenue, Ortigas Center, Pasig City. Said Rules may be downloaded from the ERC Website at www.erc.gov.ph or may be photocopied, at cost, during regular office hours at the ERC Main Office.

All interested parties may submit their comments (both hard and soft copies) on the proposed Rules on or before June 29, 2007. Electronic copies may be sent to aamendoza@erc.gov.ph or contestable@erc.gov.ph. Parties who have filed their written comments on or before prescribed period would be given priority during the above-scheduled public consultation.

Date Published: 6/1/2007

 

Today at ERC
Tuesday, November 12, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-001 DR [EV]
Applicant:
CPGI
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Petition for Full Recovery for Approved Costs in ERC Case No. 2011-030 RC Through Re-Computation of Approved Rate
Time:
14:00
Case No.:
2016-149 RC [CH]
Applicant:
PSALM
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the 6th Application for the True Up Adjustments of Fuel and Purchased Power Costs (TAFPPC), and Foreign Exchange - Related Costs (TAFxA) under the Rules of the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange Related Cost by the National Power Corporation, as Amended
Time:
14:00
Case No.:
2017-007 MC [CI]
Applicant:
Catuiran Hydropower Corporation (CHC)
Venue:
LS Conference Area (15th floor)
Title:
In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point to Point Limited Transmission Line to Connect the 8 MW Catuiran Mini Hydro Plant to ORMECOs 69 kV System