Notice of the Proposed EPIRA Amendments [Archive-26]

The Department of Energy (DOE) is considering to amend Rule 3, Section 4 (e) and (s) and Rule 18, Section 7 of the Implementing Rules and Regulations (IRR) of Republic Act No. 9136, otherwise known as the Electric Power Industry Reform Act of 2001 (EPIRA). Relative thereto, the DOE requested the assistance of the Energy Regulatory Commission (ERC) in soliciting comments from the public on the proposed amendments. Thus, notice is hereby given that the DOE's proposed amendments to Rule 3, Section 4 (e) and (s) and Rule 18, Section 7 of the EPIRA IRR are posted on the ERC website at www.erc.gov.ph for public comments.

All interested parties may submit their comments (both hard and soft copies) on the proposed amendments on or before April 16, 2007. Hard copies may be delivered to the Docket Section of the ERC located at the 15th Floor, Pacific Center Building, San Miguel Avenue, Ortigas Center, Pasig City or through fax number (02)631-5879, and soft copies may be emailed to fgbaldo@erc.gov.ph.

Date Published: 3/29/2007

 

Today at ERC
Tuesday, November 12, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-001 DR [EV]
Applicant:
CPGI
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Petition for Full Recovery for Approved Costs in ERC Case No. 2011-030 RC Through Re-Computation of Approved Rate
Time:
14:00
Case No.:
2016-149 RC [CH]
Applicant:
PSALM
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the 6th Application for the True Up Adjustments of Fuel and Purchased Power Costs (TAFPPC), and Foreign Exchange - Related Costs (TAFxA) under the Rules of the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange Related Cost by the National Power Corporation, as Amended
Time:
14:00
Case No.:
2017-007 MC [CI]
Applicant:
Catuiran Hydropower Corporation (CHC)
Venue:
LS Conference Area (15th floor)
Title:
In the Matter of the Application for Authority to Develop, Own and Operate a Dedicated Point to Point Limited Transmission Line to Connect the 8 MW Catuiran Mini Hydro Plant to ORMECOs 69 kV System