| 2008 | 2007 | 2006 | 2005 | 2004 | 2003 | 2002 |

  1. NOTICE, ERC Case No. 2006-024 RM - In the Matter of the Adoption of the Rules on Uniform Business Practices (12/27/06)
  2. ERC vows to protect consumers vs rate shocks (12/21/2006)
  3. NOTICE, ERC Case No. 2006-17 RC - In the Matter of the Adoption of the Resolution Prescribing the Timeline for Full Retail Competition and Access (12/20/06)
  4. NOTICE, ERC Case No. 2006-018 RM - In the Matter of the Adoption of the Rules for Recovery of NPC Stranded Contract Costs and Stranded Debts Portion of the Universal Charge (12/15/2006)
  5. Revisions to the Philippine Distribution Code (12/14/06)
  6. ERC to act on the WESM controversy judiciously (12/12/2006)

  7. SC upholds ERC's Decision on rate unbundling (12/12/06)

  8. ERC to entertain TRANSCO force majeure events pass through applications (12/12/2006)

  9. AESI and TA Oil - New Retail Electricity Supplier's License Grantees (12/12/06)

  10. ERC issues license to the First Wholesale Aggregator (12/12/2006)

  11. ERC approves new bill format of MERALCO (12/12/06)

  12. ERC launches website for Retail Competition (12/12/06)

  13. ERC clarifies concerns on MERALCO recoveries (12/12/06)
  14. ERC Consulted the Public on Timeline For Full Retail Competition (11-29-06)
  15. ERC grants PA on Meralco NPC Customer Choice Program (11-29-06)
  16. ERC and DTI formulate standards for electric watt-hour meters (11-29-06)
  17. ERC welcomes NPC-MERALCO supply deal (11-29-06)
  18. ERC slates Rules on NPC's Stranded Costs Recovery for PubCon (11-29-06)
  19. ERC Will Act With Dispatch Upon Receipt of Investigation Report (11/23/2006)
  20. ERC Welcomes KEPCO-Meralco Metering Project (11-21-06)
  21. ERC supports use of renewable energy resources (11/17/2006)
  22. Retail Competition Readiness Seminar for ECs a Success (11/17/2006)
  23. Notice, ERC Case No. 2006-020 RM - In the Matter of the Proposed Rules on the Accreditation of Hearing Officers / Technical Consultants and their Appointment to Act as Such in Cases before the Energy Regulatory Commission (11/16/2006)
  24. Notice of Public Consultation: Invitation to Comment on the Draft "Rules for the Adjustment of Generation Rates and System Loss Rates by Distribution Utilities" (11/16/2006)
  25. ERC Seeks to be the Benchmark for Excellence in Asia (11/14/06)
  26. ERC Extends Current Assignment of Regulatory Reset Experts (11/13/2006)
  27. ERC: Stricter System Loss Cap Guidelines to Lower Consumer Electricity Bills (11/7/2006)
  28. Notice of Public Consultation: Pro-Forma Application for Approval of Caps on the Recoverable Rate of Distribution System Losses (11/7/2006)
  29. ERC amends Business Separation Guidelines (11/7/2006)
  30. ERC approves MERALCO refund scheme (11/6/2006)
  31. Notice, ERC Case No. 2006-042 In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR), DECORP-Applicant (11/3/2006)
  32. ERC disappointed by Neri's allegations (11/2/2006)
  33. CREBA's SC petition amuses ERC (11/2/2006)
  34. Notice of Public Consultation:ERC Case No. 2006-022 RM - In the Issues Paper on Proposed Alternative Regulatory Framework for the Electric Cooperatives (11/2/2006)
  35. Notice ERC Case No. 2006-021 RM - In the Matter of the Proposed Rules to Govern the Filing of Consolidated Monthly / Annual Applications for Adjustment of Rates Under Adjustment or True-Up Mechanisms Approved by the ERC (10/30/2006)
  36. Notice ERC Case No. 2006-020 RM - In the Matter of the Proposed Rules on the Accreditation of Hearing Officers / Technical Consultants and Their Appointment to Act as such in Cases before the Energy Regulatory Commission (10/30/2006)
  37. Notice ERC Case No. 2006-019 RM - In the Matter of the Proposed Revision of Existing Schedule of Fees and Charges (10/27/2006)
  38. ERC to Consult Public on SoLR Rate Filing Rules (10/26/2006)
  39. Notice of Public Consultation ERC Case No. 2004-242 - In the Matter of the Adoption of a Methodology for Setting Distribution Wheeling Rates (10/26/2006)
  40. Notice of Postponement for the Ring-Fencing Seminar for Distribution Utilities in Luzon (10/20/2006)
  41. ERC not Remiss of its Mandate (10/20/2006)
  42. Notice ERC Case No. 2006-041 RC - In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR) (10/23/2006)
  43. ERC Seeks Comments on the Revised OATS Rules (10/17/2006)
  44. ERC completes confirmation of NMT/NEECO III's PPA charges (10/17/2006)
  45. Notice of Public Consultation: ERC Case No. 2006-018 RC In the Matter of the Adoption of the Rules for Recovery of NPC Stranded Contract Costs and Stranded Debts Portion of the Universal Charge (10/13/2006)
  46. Notice of Public Consultation: ERC Case No. 2006-17 RM - In the Matter of the Adoption of the Resolution Prescribing the Timeline for Full Retail Competition (10/12/2006)
  47. ERC Keeps an Eye on the Electricity Market's Behavior (10/12/2006)
  48. New bill format set for public consultation (10/09/2006)
  49. Notice of Public Consultation: In the Matter of the Adoption of the Rules on Rate Filing by the Supplier of Last Resort (SOLR) (10/02/2006)
  50. ERC advises Philexport to be calm and objective (9/22/2006)
  51. ERC Prepares Distribution Utilities for Retail Competition (9/15/2006)
  52. ERC Slates Grid Code Revisions for Pub Con (9/11/2006)
  53. ERC reacts on SC Ruling (9/11/2006)
  54. ERC collaborates with DOE and DTI on LGU in Bohol (9/8/2006)
  55. ERC sets minimum standards for DU frontline customer services (9/8/2006)
  56. Notice of Public Consultation: Proposed New Bill Format (MERALCO) (9/5/2006) Copy of the Bill Formats
  57. ERC honors Calderon of USAID (9/04/2006)
  58. Proposed Revisions to the Philippine Grid Code for Comments (8/29/2006)
  59. Notice on the Draft Rules for the Calculation of Over or Under Recovery in the Implementation of Transmission Rates and the Corresponding Transmission System Loss Rates by DUs (8/24/2006)
  60. ERC appeals for objectivity (8/23/2006)
  61. Notice - ERC Case No. 2004-242 - In the Matter of the Adoption of a Methodology for Setting Distribution Wheeling Rates Pro-forma Application for the Approval of the Annual Revenue Requirement And Performance Incentive Scheme for Privately Owned Distribution Utilities Entering Performance Based Rate Setting (First Entry Point) (8/17/2006) Proforma Application
  62. NOTICE - ERC Case No. 2004-242 - In the Matter of the Adoption of a Methodology for Setting Distribution Wheeling Rates Preliminary Calculation of the Construction Work in Progress (CWIP) Factor that would Apply During the Second Regulatory Period (8/17/2006)
  63. ERC completes its roster of Commissioners (8/11/2006)
  64. ERC Adopts New Rules of Practice and Procedures (8/11/2006)
  65. NOTICE, ERC Case No. 2006-015 RM - In the Matter of the Adoption of the Proposed Resolution Summarizing the Applicable Legal Principles and Policies of the Energy Regulatory Commission on End-User Connections (8/07/2006)
  66. Executive Director Castañeda is newest ERC Commissioner (8/4/2006)
  67. ERC starts year with 6 GREAT challenges (8/4/2006)
  68. 30c Mandated Rate Reduction will still be enjoyed (8/4/2006)
  69. ERC clarifies perceived electricity rate increase (8/4/2006)
  70. Notice, ERC Case No. 2006-015 RC - In the Matter of the Application for Approval of the Proposed Revised Rules, Terms and Conditions for Open Access Transmission Service (OATS) (8/04/2006)
    Revised OATS Rules, 1 of 2, 2 of 2
  71. ERC signs MOA with CDC (8/01/2006)
  72. GNPower: First Retail Electricity Supplier's License Grantee (7/21/2006)
  73. Invitation to comment on the Second Draft of the Asset Valuation Guidelines for Privately Owned Distribution Utilities Subject to Performance - Based Regulations (Draft Guidelines) (7/21/2006)
  74. ERC clarifies reports of a power rate increase in Luzon (7/20/2006)
  75. Notice of Public Consultation on the proposed Rules on the Default Wholesale Supply Arrangements for the Philippine Wholesale Electricity Spot Market (7/18/2006)
  76. ERC issues Code of Conduct for competitive retail market participants (7/10/2006)
  77. ERC sets rules on Transmission Cost Recovery for PubCon (7/7/2006)
  78. ERC to consult public on preliminary WACC Calculation (7/7/2006)
  79. PEPOA sheds light on ERC's Resolution No. 21 (7/5/2006)
  80. Invitation to comment on "Draft Rules for Setting Distribution Wheeling Rates for Privately Owned Distribution Utilities Entering Performance Based Regulation (First Entry Point) (6/30/2006)
  81. Regulatory issues on commencement of WESM clarified - ERC (6/28/2006)
  82. Pricing Methodologies Ready for WESM - ERC (6/27/2006)
  83. ERC issues Final Determination for TransCo's MAR (6/27/2006)
  84. Notice of Public Consultation, ERC Case No. 2006-011RM - In the Matter of the Adoption of the Proposed Rules for the Calculation of the Over Under Recovery in the Implementation of Transmission Rates and the Corresponding Transmission System Loss Rates by Distribution Utilities (6/16/2006)
  85. Invitation to comment on the initial bid cap set by the WESM Tripartite Committe per Joint Resolution No. 2 (6/16/2006)
  86. Invitation to comment on the 2nd Draft of the Asset Valuation Guidelines for Privately Owned DUs subject to PBR (6/16/2006)
  87. Notice of Public Consultation on the Preliminary Calculation of the Weighted Average Cost of Capital (WACC) that Would Apply During the 2nd Regulatory Period (6/16/2006)
  88. Notice of Public Consultation, In the Matter of the Adoption of the Amended Rules for the Automatic Adjustment of Generation Rates and System Loss Rates (AGRA) by DUs (6/13/2006)
    Attachment- Amended Rules for the Automatic Adjustment of Generation and System Loss Rates by DUs
  89. Notice - ERC Case No. 2006-015RC - In the Matter of the Application for the Approval of the Ammendment/Revision on the Rules, Terms and Conditions for Open Access Transmission Service (OATS) (6/15/2006)
  90. Notice - ERC Case No. 2006-012RM - In the Matter of the Adoption of the Rules for Charging for Transmission Connection Assets and Sub-Transmission Assets (6/15/2006)
  91. Notice to all DU's on the Consumer Welfare Desk's National Convention (6/13/2006)
  92. Invitation to comment on the proposed Rules on Redistribution of Electricity (6/8/2006)
  93. WESM pricing scheme ready by June - ERC (6/6/2006)
  94. ERC's not involved in PSALM and YNN negotiations (6/5/2006)
  95. Invitation to comment on the 2nd Draft of the proposed Rules of Practice and Procedures (6/5/2006)
  96. Notice of Public Consultation, In the Matter of the Implementing Guidelines for Section 43(t) of Republic Act No. 9136 and Rule 3, Section 4(m) of its IRR (6/2/2006) - Attachment- In the Matter of the Implementing Guidelines for Section 43(t) of Republic Act No. 9136 and Rule 3, Section 4(m) of its IRR
  97. Notice of Public Consultation on the Amendments to the Guidelines for the Recovery of Costs for the Generation Component of the Distribution Utilities Rates (6/2/2006) Attachment - Amendments to the Guidelines for the Recovery of Costs for the Generation Component of the Distribution Utilities Rates
  98. Notice of Public Consultation, In the Matter of the Implementing Guidelines for Section 43(t) of Republic Act No. 9136 and Rule 3, Section 4(m) of its IRR (6/2/2006)
  99. Notice of Public Consultation on the proposed Rules for the Calculation of the Over or Under Recovery in the Implementation of Transmission Rates and the Corresponding Transmission System Loss Rates by DU's (5/31/2006)
  100. ERC clarifies status of TransCo, PEMC and NPC's pending petitions (5/29/2006)
  101. UK training assistance concluded (5/29/2006)
  102. Notice of public consultation on the Proposed Rules for Charging Transmission Connection Assets and Sub Transmission Assets (5/26/2006)
  103. Notice of public consultation on the Proposed Amendment/Revision on the Rules, Terms and Conditions for Open Access Transmission Service (OATS) Rules (5/26/2006)
  104. Invitation to submit an expression of interest for the review of expenditure forecasts for electricity distribution utilities (5/26/2006)
  105. Expression of Interest Opex CAPEX review (5/26/2006)
  106. Notice of public consultation on the Draft Rules for Setting Distribution Wheeling Rates (5/17/2006)
  107. Public consultation on the draft amendment to the Business Separation Guidelines and the draft Code of Conduct for Competitive Retail Market Participants (5/5/2006)
  108. Public consultation on the draft Guidelines for the Supplier of Last Resort for the Contestable Market (5/5/2006)
  109. Notice of Public Consultation, ERC Case No. 2006-007 RM, In the Matter of the Approval of the Proposed Draft Asset Valuation Policy Guidelines for Privately Owned Distribution Utilities Subject to Performance Based Regulation (5/4/2006)
  110. ERC Asset Valuation Guidelines for Private DUs under PBR (5/4/2006)
  111. ERC holds first national RCO conference (5/3/2006)
  112. Public hearing on the Rules of Practice and Procedure before the ERC (4/27/2006)
  113. Notice of continuation of public hearing for the approval of the PDM for the Philippine WESM (4/20/2006)
  114. Notice for the public consultation on the proposed timeline for full retial competion (4/20/2006)
  115. ERC on TransCo: We know what was required from TransCo by the law (4/18/2006)
  116. ERC readies B2B IT System for retail market (4/6/2006)
  117. Pub Con on the Tax Recovery Adjustment Mechnism in the Rates of PUs (4/6/2006)
  118. Notice of continuation of public hearing for the approval of the PDM for the Philippine WESM (4/5/2006)
  119. ERC's Alcordo accepts Ortiz' apology (3/31/2006)
  120. Definition of Connection Asset for final comment (3/31/2006)
  121. Notice of expository hearing for the approval of the Price Determination Methodology for the Philippine WESM (3/31/2006)
  122. ERC is now accepting applications for RES License (3/29/2006)
  123. Hassle Free Switching and Settlement System for Retail Competition (3/29/2006)
  124. Notice, ERC Case No. 2006-004RM, In the Matter of the Approval of the Rules Prescribing the Tax Recovery Adjustment Mechanism in the Rates of Private Utilities (PUs) (3/24/2006)
  125. ERC urges Transco to set the record straight (3/24/2006)
  126. UK government grants TA to ERC (3/23/2006)
  127. Notice of the continuation of public hearing for the approval of the Administered Price for the WESM (3/22/2006)
  128. Draft Rules on Redistribution of Electricity set for public consultation (3/20/2006)
  129. Notice for the proposed format on rate application of a distribution utility for publication in a newspaper of local or general circulation (3/17/2006)
  130. ERC hosts U.S. and Australian Regulators (3/15/2006)
  131. Notice of public consultation on the proposed definition of Connection Asset (3/14/2006)
  132. Scheduled Market Fees Hearing, cancelled (3/10/2006)
  133. ERC invites consumers to a symposium on retail competition (3/9/2006)
  134. CWD training kicks off this month (3/9/2006)
  135. ERC goes public on connection charging policy for TRANSCO (3/8/2006)
  136. ERC amends guidelines on license issuance to RES (3/7/2006)
  137. ERC receives PEMCs new application for WESM Price Determination (3/6/2006)
  138. DUs to undergo mandatory regulatory education seminar (3/6/2006)
  139. Notice of public consultation on the proposed Rules for the Registration of Wholesale Aggregators (3/3/2006)
  140. Notice of public hearing on the application of PEMC for the approval of PDM for the Philippine WESM (3/2/2006)
  141. Notice of public consultation on the approval of the Rules on the Redistribution of Electricity (3/2/2006)
  142. ERC readies the Competition Rules and Complaint Procedures (3/1/2006)
  143. Notice of Public Consultation for the proposed Definition of Connection Assets for the Connection Charging Policy (2/28/2006)
  144. Notice of continuation of Administered Price Hearing for the Philippine WESM (2/24/2006)
  145. Notice of continuation of Market Fees Hearing for the Philippine WESM (2/24/2006)
  146. Notice of Public Consultation on the Guidelines for the Regulation of Qualified Third Parties (QTP) Performing Missionary Electrification in Areas Declared Unviable (2/20/2006)
  147. ERC requires DUs to designate an RCO (2/20/2006)
  148. ERC firmed up rules for regulated electric distribution services (2/20/2006)
  149. ERC readies CAPEX guidelines for DUs (2/20/2006)
  150. Standardized business rules now in process - ERC (2/20/2006)
  151. ERC clarifies news reports on AGRA suspension (2/17/2006)
  152. ERC seeks further comments on the draft Guidelines in monitoring of technical standards for DUs (2/17/2006)
  153. Press Release: ERC inks guidelines on the determination of ownership and market share limitation of power gencos (2/17/2006)
  154. ERC welcome views of power investors (2/15/2006)
  155. Notice of the continuation of public hearing for the approval of the Administered Price for the WESM (2/15/2006)
  156. Notice on the posting of the draft Competition Rules and Complaint Procedures on the ERC website (2/15/2006)
  157. PDM scheduled hearings for the Phil. WESM cancelled (2/10/2006)
  158. Notice of the continuation of public hearing for the approval of Market Fees for the Phil. WESM (2/10/2006)
  159. Hearing on Market Fees for WESM set by ERC (2/10/2006)
  160. Notice in the matter of the adoption of the Uniform Business Practices (UBP) (2/9/2006)
  161. ERC sets PDM for hearing (2/8/2006)
  162. ERC issues Draft Determination for Transco's Wheeling Rates (2/8/2006)
  163. Resolution for the Promulgation of the Distribution Services and Open Access Rules (2/2/2006)
  164. Notice of hearing for the approval of the PDM for the Phil. WESM (2/1/2006)
  165. Notice of hearing for the approval of the Market Fees for the Phil. WESM (2/1/2006)
  166. Invitation to comment on the proposed guidelines for the monitoring of power quality standards for distribution utilities (1/25/2006)
  167. Notice of expository hearing for the approval of the PDM for the Phil. WESM (1/25/2006)
  168. Notice of public hearing for the approval of the Administered Price for the Phil. WESM (1/25/2006)
  169. ERC to host Luzon Du Concon in Baguio and Tagaytay (1/23/2006)
  170. ERC urges media to be fair and objective (1/23/2006)
  171. ERC paves the way for electricity providers in declared unviable areas (1/23/2006)
  172. Notice of Public Consultations of the Guidelines for the Regulation of Qualified Third Parties performing Missionary Electrification in Areas declared Unviable by the Department of Energy (1/19/2006)
  173. Invitation to comment on the proposed Guidelines to Govern the Submission, Evaluation and Approval of Electric Distribution Capital Projects (1/19/2006)
  174. Invitation to comment on the proposed Guidelines for the Implementation of IGCA (1/18/2006)
  175. Notice of public hearing on the structure and level of Market Fees for the Philippine WESM (1/18/2006)
  176. Notice of public hearing on the structure and level of Market Fees for the Philippine WESM (1/18/2006)
  177. Notice of public hearing on the Price Determination Methodology (PDM) for the Philippine WESM (1/18/2006)
  178. Invitation to comment on the draft Guidelines for the Regulation of Qualified Third Parties performing Missionary Electrification in Areas declared Unviable by the Department of Energy (1/6/2006)