Work in Progress

Information on the pending cases / current projects of the Commission. If you have any questions on those featured here, please send it to info@erc.gov.ph.

 

 

 

 

 

 

 


ONGOING PROGRAMS & ACTIVITIES
  1. Enforcement of Rules, Regulations, Orders and Resolution of the Commission
  2. DUs Structural and Operational Reforms
  3. Establishment of a Business to Business (B2B) System
  4. Evaluation of Business Separation and Unbundling Plan (BSUP) Applications submitted by Distribution Utilities (DUs) in Luzon

ONGOING CASES

 2010-163RC
PECO
12/30/2010
 2010-162RC
CAPELCO
12/30/2010
 2010-161RC
FIBECO
12/30/2010
 2010-160RC
NORECO
12/30/2010
 2010-159RC
TRANSCO/VECO
12/22/2010
 2010-158RC
CEBECOII/CEDC
12/22/2010
 2010-157RC
CEBECOIII/CEDC
12/22/2010
 2010-156RC
CEBECOI/CEDC
12/22/2010
 2010-155RC
ISELCO
12/21/2010
 2010-154RC
MECO
12/20/2010
 2010-153RC
ILPI
12/20/2010
 2010-152RC
NGCP
12/16/2010
 2010-151RC
TRANSCO/ISECO
12/16/2010
 2010-150RC
MERALCO
12/16/2010
 2010-149RC
CLPC
12/16/2010
 2010-148RC
TRANSCO/ SURNECO
12/07/2010
 2010-147RC
ALECO
12/3/2010
 2010-146RC
MERALCO
12/1/2010
 2010-145RC
TARELCO II
11/30/2010
 2010-144RC
CELCOR
11/30/2010
 2010-143RC
PANELCO III
11/30/2010
 2010-142RC
PRESCO
11/26/2010
 2010-141RC
NORECO II
11/12/2010
 2010-139RC
NEECO II Area II
11/12/2010
 2010-138RC
BLCI
10/26/2010
 2010-137RC
ILECO I
11/15/2010
 2010-136RC
NGCP
11/15/2010
 2010-135RC
MERALCO
11/12/2010
 2010-134RC
BATANELCO
11/11/2010
 2010-133RC
QUEZELCO I
11/04/2010
 2010-131RC
CEDC
11/02/2010
 2010-130RC
KSPC/VRESCO
11/02/2010
 2010-128RC
VECO/CEDC
10/28/2010
 2010-127RC
SEZ
10/27/2010
 2010-126RC
In the Matter of the Application for Approval of the Memorandum of Agreement (MOA) for Sale of Generated Power During Commissioning Between Smith Bell Mini-Hydro Corporation and Nueva Vizcaya Electric Cooperative, with Prayer for the Issuance of Provisional Authority
SBMHC/NUVELCO
10/20/2010
 2010-125RC
In the Matter of the Application for the Approval of the Commissioning Power Sales Contract Between KEPCO SPC Power Corporation (KSPC) and Negros Oriental I Electric Cooperative, Inc. (NORECO I), with Motion for the Issuance of Provisional Authority
KSPC/NORECO I
10/15/2010
 2010-124RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)
PANELCO
10/15/2010
 2010-123RC
In the Matter of the Application for Approval of Emergency Capital Expenditure Projects and the Authority to Secure Loan from tne National Electrification Administration (NEA) in Accordance with the Provisions of R.A. No.9136 and the Rules for Approval of Regulated Entities's Capital Expenditure Projects, with Prayer for Issuance of Provisional Authority
SIARELCO
10/11/2010
 2010-122RC
In the Matter of the Application for Approval of the Proposed Application of Capital Expenditure Projects for the Year 2010 to 2012 with Prayer for Provisional Authority
BENECO
10/08/2010
 2010-121RC
In the Matter of the Application for the Approval of the Contract for the Supply of Electric Energy Between Masinloc Power Partners Co. Ltd. and Camarines Sur II Electric Cooperative, Inc., with Prayer for Provisional Authority
CASURECO II/MPPCL
10/07/2010
 2010-119RC
In the Matter of the Application for Approval of the Proposed Capital Expenditure Projects for Years 2010 to 2014
BATELEC II
09/29/2010
 2010-118RC
In the Matter of the Application for Approval of Capital Expenditure Program for the Year 2010 to 2013 with Prayers for Provisional Authority and Authority to Secure Loan
NEECO I
09/29/2010
 2010-117RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)
BLCI
09/27/2010
 2010-116RC
In the Matter of the Application for Recovery of Actual Fuel and Lubricant Costs Incurred for the Period March 15 to August 25, 2010
CLPC
09/27/2010
 2010-115RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)
SEZ
09/24/2010
 2010-114RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)
SFELAPCO
09/24/2010
 2010-113RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)
AEC
09/24/2010
 2010-112RC
In the Matter of the Application of the National Grid Corporation of the Philippines for the Approval of Force Majeure (FM) Event Regulated FM Pass Through for the Typhoons Ondoy and Pepeng and Sabotage in Mindanao, in Accordance with the Rules for Setting Transmission Wheeling Rates (RTWR), with Prayer for Provisional Authority
NGCP
09/24/2010
 2010-111RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)
CEDC
09/24/2010
 2010-110RC
In the Matter of the Application for Review, Evaluation and Approval for the Construction of the 69kV Subtransmission Line from NGCP Lunzaran to the City Load Center at Camanchile Drive, Zamboanga City
ZAMCELCO
09/24/2010
 2010-109RC
In the Matter of the Application for Authority to Implement 2010-2011 Major Electrical Capital Projects (ECPs) and Non Electrical Capital Projects, with prayer for Issuance Provisional Authority
CEDC
09/15/2010
 2010-108RC
In the Matter of the Application for Apporval of the Electric Power Purchase Agreement (EPPA) between Aklan Electric Cooperative, Inc. and Panay Energy Development Corporation, with prayer for Issuance Provisional Authority
AKELCO/PEDC
08/31/2010
 2010-107RC
In the Matter of the Application for Apporval of Capital Projects and Authority to Secure Loans from NEA in Accordance with the Provisions of R.A. No. 9136 and the Rules for the Approval of Regulated Entities' Capital Expenditure Projects with prayer for Issuance Provisional Authority
PELCO
08/31/2010
 2010-106RC
In the Matter of the Application for an Adjustment in Rates under the Rules for setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with prayer for Provisional Authority
COTELCO
08/31/2010
 2010-105RC
In the Matter of the Application for Approval of Capital Expenditure Program for the Year 2010 to 2014
SORECO I
08/18/2010
 2010-104RC
In the Matter of the Application for Approval of the Sale of Various Subtransmission Lines/Asstes of the National Transmission Corporation (TransCo) to Peninsula Electric Cooperative, Inc. (PENELCO), as covered by an Amended Lease Purchase Agreement (LPA) Date 2 February 2009
TransCo/PENELCO
08/17/2010
 2010-103RC
In the Matter of the Application for Approval of Capital Expenditure Program for the Year 2010 to 2012
LUELCO
08/16/2010
 2010-102RC
In the Matter of the Application for Approval of Capital Expenditure Program for the Year 2010 to 2012
ABRECO
08/16/2010
 2010-101RC
In the Matter of the Application for Approval of Proposed Electric Capital Projects for the Year 2010 to 2012 and Authority to Secure Loan from NEA, with Prayer for Provisional Authority
DASURECO
08/11/2010
 2010-100RC
In the Matter of the Application for Approval of the Electric Power Purchase Agreement (EPPA) between Mactan Electric Comapany, Inc. (MECO) and Cebu Energy Development Corporation (CEDC), with Prayer for Provisional Authority
MECO/CEDC
08/11/2010
 2010-099RC
In the Matter of the Application for Approval of Proposed Electric Capital Projects for the Year 2010 to 2014 and Authority to Secure Loan from NEA with Prayer for Provisional Authority
AURELCO
08/11/2010
 2010-098RC
In the Matter of the Application for Approval of Proposed Construction of Submarine Cable
CAMELCO
08/09/2010
 2010-097RC
In the Matter of the Application for Approval of the Electric Power Purchase Agreement (EPPA) between Panay Electric Comapany, Inc. and Panay Energy Developemtn Corporation with Prayer for Provisional Authority
PECO/PEDC
08/06/2010
 2010-096RC
In the Matter of the Application for the Sale of Various Sub-Transmission Lines/Assets of the National Transmission Corporation (TRANSCO) to the La Union Electric Company, Inc. (LUECO) as Covered by a Contract to Sell
TRANSCO/LUECO
08/03/2010
 2010-095RC
In the Matter of the Application for Approval of the Electric Power Purchase Agreement (EPPA) between Bohol I Electric Cooperative, Inc. and Cebu Energy Development Corporation (CEDC), with Prayer for Provisional Authority
BOHOL/CEDC
07/30/2010
 2010-094RC
In the Matter of the Application for Authority to Implement 2010 Major Capital Projects, with Prayer for Provisional Authority
SFELAPCO
07/27/2010
 2010-093RC
In the Matter of the Application for the Approval of Emergency Capital Expenditure Project to Construct a 10MVA Substation at Carig, Tuguegarao City
CAGELCO I
07/27/2010
 2010-092RC
In the Matter of the Application for the Approval of the Supplemental Agreement to the Contract for the Supply of Electric Energy Between Dagupan Electric Corporation and Masinloc Power Partners Co.LTD., with Prayer for Provisional Authority
DECORP/MPPCL
07/26/2010
 2010-091RC
In the Matter of the Application for the Approval of the Taytay (Dolores) Substation Upgrade Project, with Prayer for Provisional Authority
NGCP
07/26/2010
 2010-090RC
In the Matter of the Application for the Approval of Rate Adjustment in Accordance with R.A. No. 9136, with Prayer for Provisional Authority
ROMELCO
07/23/2010
 2010-089RC
In the Matter of the Application for the Approval of the Connection Agreement and Distribution Wheeling Service Agreement, Together with the Attached Rate Schedules, Between Meralco and Eagle Cement Corporation, Pursuant to ERC Resolution No. 1 Series of 2009, with Prayer for Provisional Authority
NPC-SPUG
07/23/2010
 2010-088RC
In the Matter of the Application for the Approval of the Sale of Various Sub-Transmission Lines/Assets of the National Transmission Corporation (TRANSCO) to Camiguin Electric Cooperative, Inc. (CAMELCO) as covered by a Lease Purchase Agreement (LPA)
TRANSCO/CAMELCO
07/21/2010
 2010-087RC
In the Matter of the Application for the Approval of the True Cost Generation Rate for the Province of Siquijor, with Prayer for Provisional Authority,
NPC-SPUG
07/15/2010
 2010-084RC
In the Matter of the Application for the Approval of the Electricity Sales Agreement Between Iloilo Electric Cooperative II and Green Power Panay Philippines Inc. with prayer for provisional authority,
ILECO II
07/08/2010
 2010-083RC
In the Matter of the Application for the Approval of the Electricity Sales Agreement Between Iloilo Electric Cooperative I and Green Power Panay Philippines, Inc. with prayer for provisional authority,
ILECO I
07/08/2010
 2010-082RC
In the Matter of the Application for the Approval of the power supply agreement between Albay Electric Cooperative, Inc., and Ap renewable Inc,.with prayer for provisional authority,
ALECO
07/06/2010
 2010-081RC
In the Matter of the Application for the Approval of the Agreement for the Supply of Electric Power Between Crystal Sugar Co. Inc. (CSCI) and First Bukidnon Electric Cooperative, Inc. (FIBECO), with Prayer for Provisional Authority.
FIBECO/CSCI
07/05/2010
 2010-080RC
In the Matter of the Approval of the Regulated Entities' Capital Expenditure Projects (CAPEX) for C.Y. 2012.
PANELCO-1
07/01/2010
 2010-079RC
In the Matter of the Application for the Approval of the Level of Market Transaction Fees for Calendar Years 2010-2011 for the Philippine Wholesale Electricity Spot Market (WESM) with Prayer for Issuance Exparte of Provisional Authority.
PEMC
07/01/2010
 2010-078RC
In the Matter of the Application for Approval of the Electric Power Supply Agreement Between Davao Light and Power Co., Inc. and HEDCOR, Inc.
DLPC/HEDCOR
06/29/2010
 2010-077RC
Petition for the Recovery of the National Power Corporation's Stranded Debts Portion of the Universal Charge for the Luzon, Visayas, and Mindanao Grids
PSALM
06/29/2010
 2010-076RC
Petition for the Recovery of the National Power Corporation's Stranded Contract Costs Portion of the Universal Charge for the Luzon Grid
PSALM
06/29/2010
 2010-075RC
In the Matter of the Application for Approval of the Power Supply Agreement (PSA) Between Nueva Ecija II Electric Cooperative , Inc. Area 2 and First Gen Hydro Power Corporation, with Prayer for the Issuance of Provisional Authority
NEECO II Area 2
06/29/2010
 2010-074RC
In the Matter of the Application for the Recovery of the Incremental Costs on Foreign Currency Exchange Rate Fluctuations under the Incremental Currency Exchange Rate Adjustment (ICER) with Prayer for Provisional Authority (PA)
PSALM/NPC
06/25/2010
 2010-073RC
In the Matter of the 17th Application for the Recovery of Incremental Fuel and Independent Power Producer (IPP) Costs under the Generation Rate Adjustment Mechanism (GRAM) with Prayer for Provisional Authority (PA)
PSALM/NPC
06/25/2010
 2010-072RC
In the Matter of the Application for the Recovery of Wheeling Charges Paid to Davao Light and Power (DLPC) for Samal Island by Davao Del Norte Electric Cooperative, Inc. with Prayer for Issuance of Provisional Authority
DANECO
06/25/2010
 2010-070RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)
DECORP
06/21/2010
 2010-069RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme for the Third Regulatory Period (2011 to 2015) in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR), as Amended
MERALCO
06/18/2010
 2010-068RC
In the Matter of the 16th Application for the Recovery of the Incremental Fuel and Independent Power Producer (IPP) Costs under the Generation Rate Adjusment Mechanism (GRAM) with Prayer for Provisional Authority (PA)
NPC/PSALM
06/18/2010
 2010-067RC
In the Matter of the 15th Application for the Recovery of the Incremental Costs on Foreign Currency Exchange Rate Fluctuations Under the Incremental Currency Exchange Rate Adjustment (ICERA) with Prayer for Provisional Authority (PA)
NPC/PSALM
06/18/2010
 2010-066RC
In the Matter of the Application for Approval of the Electric Power Purchase Agreement (EPPA) Between Antique Electric Cooperative, and Panay Energy Development Corporation, with Prayer for Provisional Authority
ANTECO/PEDC
06/17/2010
 2010-065RC
In the Matter of the Application for Approval of the National Grid Corporation of the Philippines for the Approval of Force Majeure (FM) Event Regulated FM Pass Through for the Lightning at Matnog Repeater Station and Sabotage in Mindanao in Accordance with the Rules for Setting Transmission Wheeling Rates, with Prayer for Provisional Authority
NGCP
06/15/2010
 2010-064RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)
CEPALCO
06/15/2010
 2010-063RC
In the Matter of the Petition to Allow Petitioner to Charge and Maintain the April, 2010 Generation Charge of PhP7.2169/kWh as Provisionally Approved until Under Recoveries shall have been fully recovered, with prayer for provisional authority.
MASELCO
06/08/2010
 2010-062RC
In the Matter of the Petition to Allow Petitioner to Charge and Maintain the April, 2010 Generation Charge of PhP7.2169/kWh as Provisionally Approved until Under Recoveries shall have been fully recovered, with prayer for provisional authority.
CELCOR
06/07/2010
 2010-061RC
In the Matter of Application for Approval of Tayabas Substation Expansion Project-1, with prayer for provisional authority.
NGCP
06/03/2010
 2010-060RC
In the Matter of Application for Approval of Visayas Substation Expansion Project-I, with prayer for provisional authority.
NGCP
06/03/2010
 2010-059RC
In the Matter of Application for Approval of Reliability Compliance Project 1-Mindanao(Phase III-Mindanao Shunt Reactors and Capacitors), with prayer for provisional authority.
NGCP
06/03/2010
 2010-058RC
In the Matter of Application for Approval of New Naga-Banilad 138 KV Transmission line Project, with prayer for provisional authority.
NGCP
06/03/2010
 2010-057RC
In the Matter of Application for Approval of the Luzon Substation Reliability Project-1, with prayer for provisional authority.
NGCP
06/03/2010
 2010-056RC
In the Matter of Application for Approval of the NorthEastern Transmission Development Project(MAGAPIT CAPACITOR), with prayer for provisional authority.
NGCP
06/03/2010
 2010-055RC
In the Matter of Application for Approval of the Electric Power Purchase Agreement (EPPA) between Iloilo II Electric Cooperative, INC. and Panay Energy Development Corporation, with prayer for provisional authority.
ILECO II/PEDC
05/31/2010
 2010-053RC
In the Matter of Application for Approval of the sales of various sub-transmission lines/assets of the National Transmission Corporation (TRANSCO) to the Ilocos Norte Electric Cooperative, INC. (INEC), as covered by a lease purchase agreement (LPA).
TRANSCO/INEC
05/31/2010
 2010-052RC
In the Matter of Application for Approval of the Agreement for the Supply of Electric Power Between Cantingas Mini-Hydro Power Corporation (CHPC) and Romblon Electric Cooperative, Inc. with Prayer for Provisional Authority
ROMELCO/CHPC
05/31/2010
 2010-051RC
In the Matter of Application for Approval of the Proposed Electric Capital Projects for the Year 2010 to 2012
DANECO
05/31/2010
 2010-049RC
In the Matter of Application for Approval of the Proposed Capital Expenditure Projects for the Year 2011 to 2012 and Authority to Secure Loan from NEA
ANECO
05/25/2010
 2010-048RC
In the Matter of Application for Approval of the New Antipolo 230KV Substation Project, with Prayer for the Issuance of a Provisional Authority
NGCP
05/20/2010
 2010-047RC
In the Matter of Application for Approval of the Dasmarinas EHV Substation Expansion Project, with Prayer for the Issuance of a Provisional Authority
NGCP
05/20/2010
 2010-046RC
In the Matter of Application for Approval of the Kalayaan-New Makban 230KV Transmission Line Upgrading Project, , with Prayer for the Issuance of a Provisional Authority
NGCP
05/20/2010
 2010-045RC
In the Matter of Application for Approval of the Visayas Substation Reliability Project-1 (Compostela Substation Expansion Project), with Prayer for the Issuance of a Provisional Authority
NGCP
05/20/2010
 2010-044RC
In the Matter of Application for Approval of the San Esteban with Prayer for the Issuance of a Provisional Authority
NGCP
05/20/2010
 2010-043RC
In the Matter of Application for Approval of the Nuling and Tindalo Substations, Expansion Projects, with Prayer for the Issuance of a Provisional Authority
NGCP
05/20/2010
 2010-042RC
In the Matter of Application for Approval of the Translation into Distribution Rates of Different Customer Classes for the First Regulatory Year of the ERC Approved Annual Revenue Requirement for the Visayan Electric Company, Inc. (VECO) under the Performance Based Regulation (PBR) for the Regulatory Period July 1, 2010-June 30, 2014
VECO
05/19/2010
 2010-039RC
In the Matter of Application for the Reclassification of the Manila Electric Company's Development of the Paco 230KV-115KV Delivery Point Substation Project
NGCP
05/5/2010
 2010-033RC
In the Matter of Application for Approval of the Translation into Distribution Related Rates of Different Customer Classes for the First Regulatory Year of the ERC-Approved Annual Revenue Requirement for Ibaan Electric and Engineering Corporation (IEEC) Under the Performance Based Regulation (PBR) for the Regulatory Period 2011-2014, with Prayer for Provisional Authority
IEEC
04/19/2010
 2010-032RC
In the Matter of the Petition for Review/Evaluation and Approval of the Additional Emergency and Unplanned Capital Expenditure Projects for the Year 2010, with Prayer for Provisional Authority
ZAMCELCO
04/19/2010
 2010-031RC
In the Matter of Application for Approval of the Translation into Distribution Related Rates of Different Customer Classes for the First Regulatory Year of the ERC-Approved Annual Revenue Requirement for LUECO Under the Performance Based Regulation (PBR) for the Regulatory Period 2011-2014, with Prayer for Provisional Authority
LUECO
04/16/2010
 2010-030RC
In the Matter of Application for Approval of the Translation into Distribution Rates of Different Customer Classes the Maximum Average Price for the First Year of the Second Regulatory Period of the ERC Approved Annual Revenue Requirement for CELCOR under the Peroformance Based Regulation (PBR) for the Regulatory Period 2011-2014 with Prayer for Provisional Authority
CELCOR
04/12/2010
 2010-029RC
In the Matter of Application for Approval of the Translation into Distribution Rates of Different Customer Classes for the First Regulatory Year of the ERC-Approved Annual Revenue Requirement for Tarlac Electric, Inc. (TEI) Under the Performance Based Regulation (PBR) for the Regulatory Period 2011-2014
TEI
04/12/2010
 2010-028RC
In the Matter of Application for Approval of the Power Supply Agreement and the Proposed Collection Deferment Mechanism, with Prayer for Provisional Authority
ZAMCELCO and IN2POWER, INC.
04/5/2010
 2010-027RC
In the Matter of Application for Approval of a.)Maximum Average Price Map (MAP) for the Regulatory Year 2011 and b.) Translation of the Maximum Average Price for the Regulatory Year 2011 (RY2011) into a Distribution Rate Structure for its Various Customer Classes with Prayer for the Issuance of a Provisional Authority
MERALCO
04/5/2010
 2010-026RC
In the Matter of Application for Approval of the Ancillary Services Procurement Agreement (ASPA) between the National Grid Corporation of the Philippines and Sn Aboitiz Power Benguet, Inc. with Prayer for Provisional Authority
NGCP-SNAP-BENGUET
03/31/2010
 2010-024RC
In the Matter of Application for Approval of the Maximum Average Price for the 4th Regulatory Year of the 2nd Regulatory Period (MAP2010)
CEPALCO
03/29/2010
 2010-023RC
In the Matter of Application for Recovery of Actual Fuel and Lubricant Costs Incurred for the Period 2004-2010, and for Approval of a Formula for Automatic Recovery of Fuel and Lubricant Costs, Inc., with Prayer for Provisional Authority
CLPC
03/23/2010
 2010-022RC
In the Matter of the Petition for the Approval of a Lower Generation Charge for the Billing Month of March 2010 and for the Recovery of the Differential Generation Charge within a Six (6) Month Period, including the Carrying Cost,, with Prayer for Provisional Authority
CELCOR
03/26/2010
 2010-021RC
In the Matter of Application for Approval of the Application for Approval of the Power Supply Agreement Between Ibaan Electric And Engineering Corporation and Therma Luzon, Inc., with Prayer for Provisional Authority
IEEC & TLI
03/16/2010
 2010-020RC
In the Matter of Application for Approval of Renegotiated Electricity Purchase Agreement (EPA)
CEPALCO & MINERGY
03/16/2010
 2010-019RC
In the Matter of the Petition for the Availment of the Environmental Charge/Share from the Universal Charge for the Rehabilitation and Management of Watershed Areas (Plan 7), with Prayer for Provisional Authority
NPC
03/15/2010
 2010-018RC
In the Matter of the Application for Approval of the Power Sales Contract Between IN2POWER, Inc & Camarines Sur II Elec. Cooperative, Inc. (CASURECO II), with Motion for the Issuance of Provisional Authority
IN2POWER, Inc & CASURECO II
03/12/2010
 2010-017RC
In the Matter of the Petition for the Approval of a Lower Generation Charge for Billing Month of March 2010 and for the Recovery of the Differential Generation Charge within a Six (6) Month Period, including the Carrying Cost, with Prayer for Provisional Authority
MERALCO
03/09/2010
 2010-016RC
In the Matter of the Application for Authority to Implement 2010 Major Capital Projects,with Prayer for Provisional Authority
AEC
03/9/2010
 2010-015RC
In the Matter of the Application for Approval of Capital Projects in accordance with the provisions of R.A. 9136 and the Guidelines to Govern the Submission, Evaluation and Approval of Electric Capital Projects,with Prayer for Provisional Authority
LANECO
02/24/2010
 2010-014RC
In the Matter of the Application for Approval of the Ancillary Services Procurement Agreement (ASPA) between the National Grid Corporation of the Philippines and Therma Marine.,with Prayer for Provisional Authority
NGCP/THERMA MARINE
02/19/2010
 2010-013RC
In the Matter of the Application for the Approval of the Agreement for the Supply of Electric Energy Entered into by Meralco with the National Irrigation Administration, Pursuant to ERC Resolution No. 1, Series of 2009, with Prayer for Provisional Authority
MERALCO
02/19/2010
 2010-012RC
In the Matter of the Application for Approval of Proposed Electric Capital Projects for the Year 2009 to 2013 and Authority to Secure Loan from NEA, with Prayer for Porvisional Authority
FIBECO
02/19/2010
 2010-009RC
In the Matter of the Application for Approval of the Implementation of the Construction of the Connection Assets Associated with the 2X300 MW Coal-Fired Power Plant of GNPower Mariveles Coal Plant Ltd. Co., with Prayers for Provisional Authority
NGCP/GNPOWER
01/26/2010
 2010-008RC
In the Matter of the Application for Approval of the Power Supply Agreement between First Farmers Holding Corporation (FFHC) and Negros Occidental Electric Cooperative, Inc. (NOCECO), with Motion for the Issuance of Provisional Authority
FFHC/NOCECO
01/25/2010
 2010-007RC
In the Matter of the Application for Approval of the Construction of 50/62.5 MVA Sub-Station and 2.5KM 69KV Sub-Transmission Line with Prayer for Provisional Authority
PECO
01/21/2010
 2010-006RC
In the Matter of the Application for the Approval of the Power Sales Agreement between VMC Rural Electric Service Cooperative, Inc., and First Farmers Holdings, Corporation (FFHC).
VRESCO
01/14/2010
 2010-005RC
In the Matter of the Application for the Approval of the Contract for the Supply of Electric Energy between Dagupan Electric Corporation and Masinloc Power Partners Co. LTD., with Prayer for Issuance of Provisional Authority
DECORP
01/07/2010
 2010-004RC
In the Matter of the Application for Confirmation of Capital Assets Purchased from the National Electrification Administration (NEA), with Prayer for Issuance of Provisional Authority
NEECO II
01/07/2010
 2010-003RC
In the Matter of the 15th Application for the Recovery of Incremental Fuel and Independent Power Producer (IPP) Costs under the Generation Rate Adjustment Mechanism (GRAM), with Prayer for Provisional Authority (PA)
NPC/PSALM
01/05/2010
 2010-002RC
In the Matter of the 14th Application for the Recovery of the Incremental Costs on Foreign Currency Exchange Rate Fluctuations under the Incremental Currency Exchange Rate Adjustment (ICERA), with Prayer for Provisional Authority (PA)
NPC/PSALM
01/05/2010
 2010-001RC
In the Matter of the Application for Approval for Rate Adjustments in Accordance with the Provisions of R.A 9163, with Prayer for Issuance of Provisional Authority
CELCO
01/05/2010