Work in Progress

Information on the pending cases / current projects of the Commission. If you have any questions on those featured here, please send it to info@erc.gov.ph.

 

 

 

 

 

 

 


ONGOING PROGRAMS & ACTIVITIES
  1. Enforcement of Rules, Regulations, Orders and Resolution of the Commission
  2. DUs Structural and Operational Reforms
  3. Establishment of a Business to Business (B2B) System
  4. Evaluation of Business Separation and Unbundling Plan (BSUP) Applications submitted by Distribution Utilities (DUs) in Luzon

ONGOING CASES

Case No.
Case Title
Applicant
Date Filed
 2009-180RC
In the Matter of the Application for the Approval of the Maximum Annual Revenue for the Third Regulatory Period (2010 to 2015) of the National Grid Corporation of the Philippines (NGCP) during the Regulatory Reset Process for the Third Regulatory Period in Accordance with the Alternative Form of Rate Setting Methodology under the Rules in Setting the Transmission Wheeling Rates (RTWR)
NGCP
12/21/2009
 2009-179RC
In the Matter of the Application for Approval of the Translation into Distribution Rates of Different Customer Classes for the Second Regulatory Year of the ERC-Approved Annual Revenue Requirement for Iligan Light and Power, Inc, (ILPI) under the Performance based Regulation (PBR) for the Regulatory Period 2010-2013
ILPI
12/21/2009
 2009-178RC
In the Matter of the Application for Approval of: a) The Revised X-Factor, Smoothed Map and PIS for the Second Regulatory Period; b) The Recalculated Map for Regulatory Year 2011; and c) The Translation into Distribution Related Rates of Different Customer Classes for the Second Regulatory Year of the ERC-Approved Annual Revenue Requirement for CLPC under the Performance based Regulation (PBR) for the Regulatory Period 2009-2013, with Prayer for Issuance of Provisional Authority
CLPC
12/21/2009
 2009-177RC
In the Matter of the Application for Approval of Emergency Capital Projects in Accordance with the Provisions of R.A No. 9136 and the Guidelines to Govern the Submission, Evaluation, and Approval of Electric Capital Projects, with Prayer for Issuance of Provisional Authority
ISELCO II
12/21/2009
 2009-176RC
In the Matter of the Application for Approval of the Approval of the Contract for the Supply of Electric Energy Between Masinloc Power Partners Co. LTD. and La Union Electric Cooperative, Inc., with Prayer for Provisional Authority
LUELCO
12/15/2009
 2009-175RC
In the Matter of the Application for Approval of the Translation into Distribution Rates of Different Customer Classes for the Second Regulatory Year of the ERC-Approved Annual Revenue Requirement for Mactan Electric Company, Inc., (MECO) Under the Performance based Regulation (PBR) for the Regulatory Period 2009-2013
MECO
12/15/2009
 2009-174RC
In the Matter of the Application for Approval of the Sale of Various Sub-Transmission Lines/Assets of the National Transmission Corporation (TRANSCO) to Manila Electric Company (MERALCO), as Covered by a Contract to Sell, with Prayer for the Issuance of Provisional Authority
TRANSCO/MERALCO
12/3/2009
 2009-173RC
In the Matter of the Application for Approval of the Contract fot the Supply of Electric Energy between Masinloc Power Partnert Co. LTD. and Aurora Electric Cooperative, Inc., with Prayer for the Issuance of a Provisional Authority
AURELCO
11/27/2009
 2009-171RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority (Amended Application)
CASURECO IV
11/25/2009
 2009-170RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
CAPELCO
11/25/2009
 2009-169RC
In the Matter of the Application for Approval of the Power Supply Agreement Between First Bay Power Corporation and AP Renewables Inc., with Prayer for the Issuance of a Provisional Authority
FBPC
11/24/2009
 2009-168RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
FLECO
11/24/2009
 2009-167RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
CENECO
11/24/2009
 2009-166RC
In the Matter of the Application for Approval of the Power Supply Agreement between San Fernando Electric Light and Power Company and AP Renewables, Inc., with Prayer for the Issuance of a Provisional Authority
PSA
11/24/2009
 2009-165RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
BENECO
11/24/2009
 2009-164RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
BATELEC II
11/24/2009
 2009-163RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ZAMECO I
11/18/2009
 2009-162RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
MOPRECO
11/18/2009
 2009-161RC
In the Matter of the Application of the National Grid Corporation of the Philippines for the Approval of Force Majeure (FM) Event Regulated FM Pass through for the Sabotage in Mindanao in Accordance with the Rules for Setting Transmission Wheeling Rates, with Prayer for the Issuance of a Provisional Authority
NGCP
11/18/2009
 2009-160RC
In the Matter of the Application of the National Grid Corporation of the Philippines for the Approval of the Maximum Allowable Revenue (MAR) for Calendar Year 2010 in Accordance with the Alternative form of Rate setting Methodology under the Rules for Setting Transmission Wheeling Rates, with Prayer for the Issuance of a Provisional Authority
NGCP
11/18/2009
 2009-159RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ISELCO II
11/18/2009
 2009-158RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
MORECO I
11/16/2009
 2009-157RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
AKELCO
11/16/2009
 2009-156RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
CANORECO
11/16/2009
 2009-155RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
DORECO
11/16/2009
 2009-154RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
SURSECOII
11/16/2009
 2009-153RC
In the Matter of the Application for Approval of Connection Charges and Residual Subtransmission Charges for Calenda Year 2009 on the Excluded Services Covering the Ecistiong Subtransmission Assets of the National Grid Corporation of the Philippines (NGCP), with Prayer for the Issuance of a Provisional Authority
NGCP
11/13/2009
 2009-152RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
IFELCO
11/13/2009
 2009-151RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
LEYECO IV
11/13/2009
 2009-150RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
SOCOTECO
11/13/2009
 2009-149RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
NUVELCO
11/12/2009
 2009-148RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
CENPELCO
11/12/2009
 2009-147RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
LEYECO
11/12/2009
 2009-1456RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
LANECO
11/11/2009
 2009-145RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
MOELCI I
11/11/2009
 2009-144RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
DANECO
11/11/2009
 2009-143RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
CASURECO II
11/11/2009
 2009-142RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
SOCOTECO I
11/11/2009
 2009-141RC
In the Matter of the Application for Approval of The Contract for the Supply of Electric Energy Between Zambales II Electric Cooperative Inc and Masinloc Power Partners Company, Limited, with Prayer for the Issuance of a Provisional Authority
ZAMECO II
11/11/2009
 2009-140RC
In the Matter of the Application for Approval of The Power Supply Agreement Between Sorsogon I Electric Cooperative Inc and AP Renewables, Inc., with Prayer for the Issuance of a Provisional Authority
SORSOGON I
11/11/2009
 2009-139RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ILECO III
11/11/2009
 2009-138RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ESAMELCO
11/11/2009
 2009-137RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
DASURECO
11/11/2009
 2009-136RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
SOLECO
11/11/2009
 2009-135RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ILECO I
11/10/2009
 2009-134RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
CASURECO III
11/10/2009
 2009-133RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
DORELCO
11/10/2009
 2009-132RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
NORECO I
11/9/2009
 2009-131RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
MOELCI II
11/9/2009
 2009-130RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
GUIMELCO
11/9/2009
 2009-129RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ZAMCELCO
11/9/2009
 2009-128RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
INEC
11/9/2009
 2009-127RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
SUKELCO
11/9/2009
 2009-126RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ZAMECO II
11/9/2009
 2009-125RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
VRESCO
11/9/2009
 2009-124RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ASELCO
11/9/2009
 2009-123RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
SORECO I
11/9/2009
 2009-122RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ANTECO
11/9/2009
 2009-121RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ZAMSURECO II
11/9/2009
 2009-120RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ZANECO
11/9/2009
 2009-119RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ILECO II
11/9/2009
 2009-118RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
TARELCO II
11/9/2009
 2009-117RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
QUEZELCO I
11/9/2009
 2009-116RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
BATELEC I
11/9/2009
 2009-115RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
NEECO II Area 2
11/6/2009
 2009-114RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
TARELCO I
11/6/2009
 2009-113RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
SAJELCO
11/6/2009
 2009-112RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
SURNECO
11/6/2009
 2009-111RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
LEYECO II
11/6/2009
 2009-110RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
NORSAMELCO
11/6/2009
 2009-109RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
NOCECO
11/6/2009
 2009-108RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
LEYECO III
11/6/2009
 2009-107RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ISELCO I
11/6/2009
 2009-106RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ALECO
11/6/2009
 2009-105RC
In the Matter of the Application for Approval of the Contract for the Supply of Electric Energy Between Masinloc Power Partners Co. Ltd. and Pampanga Rural Electric Service Cooperative, Inc., with Prayer for the Issuance of a Provisional Authority
PRESCO
11/6/2009
 2009-104RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
PENELCO
11/6/2009
 2009-103RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
CAMELCO
11/5/2009
 2009-102RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
KAELCO
11/5/2009
 2009-101RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
SORECO II
11/5/2009
 2009-100RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ABRECO
11/5/2009
 2009-099RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
NEECO I
11/5/2009
 2009-098RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
BOHECO I
11/5/2009
 2009-097RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
NEECO II
11/5/2009
 2009-096RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
PANELCO III
11/5/2009
 2009-095RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
CAGELCO II
11/5/2009
 2009-094RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
LUELCO
11/5/2009
 2009-093RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
SURSECO I
11/5/2009
 2009-092RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
SAMELCO I
11/5/2009
 2009-091RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
NORECO II
11/5/2009
 2009-090RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ANECO
11/5/2009
 2009-089RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
QUIRELCO
11/5/2009
 2009-088RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ISECO
11/5/2009
 2009-087RC
In the Matter of the Application for Approval of the Agreement for the Supply of Electricity and Contract for Electric Service Entered in by MERALCO with NPC SPUG-Luzon and NPC SPUG-MQNL, respectively, Pursuant to ERC Resolution No. 1, series of 2009, with Prayer for the Issuance of a Provisional Authority pages 1-11, pages 12-22
MERALCO
11/5/2009
 2009-086RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
PELCO II
11/5/2009
 2009-085RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
QUEZELCO II
11/5/2009
 2009-084RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
SIARELCO
11/5/2009
 2009-083RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
SAMELCO II
11/4/2009
 2009-082RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
ZAMSURECO I
11/4/2009
 2009-081RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
CASURECO I
11/4/2009
 2009-080RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
BOHECO II
11/4/2009
 2009-079RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
PRESCO
11/3/2009
 2009-078RC
In the Matter of Petition for Approval of the Power Supply Agreement Between Apo Cement Corporation and Visayan Electirc Company, Inc. (VECO), with Prayer for the Issuance of a Provisional Authority
APOCEMCO/VECO
10/29/2009
 2009-077RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
BILECO
10/29/2009
 2009-076RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
CAGELCO I
10/29/2009
 2009-075RC
In the Matter of the Application for Approval of the Electric Power Purchase (EPPA) Between Visayan Electric Company, Inc. and Cebu Energy Development Corporation, with Praye for the Issuance of a Provisional Authority
VECO/CEDC
10/28/2009
 2009-074RC
In the Matter of the Application for Approval of the New Unbundled Rate, with Prayer for the Issuance of a Provisional Authority
MARELCO
10/28/2009
 2009-073RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
AURELCO
10/27/2009
 2009-072RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
MORESCO II
10/22/2009
 2009-071RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
CEBECO III
10/22/2009
 2009-070RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
CEBECO I
10/22/2009
 2009-069RC
In the Matter of the Application for Approval of Rates Under the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
CEBECO II
10/22/2009
 2009-068RC
In the Matter of the Application for Approval of Implementation of the Rules for Setting Electric Cooperative's Wheeling Rates (RSEC-WR), with Prayer for the Issuance of a Provisional Authority
FIBECO
10/21/2009
 2009-067RC
In the Matter of the Application for Authority to Unbundle Rates and Approval of Revised Rate Schedule in Accordance with Section 36, with Prayer for the Issuance of a Provisional Authority
CEDC
10/15/2009
 2009-066RC
In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperaives' Wheeling Rates (RSEC-WR) , with Prayer for the Issuance of a Provisional Authority
PELCO 1
10/14/2009
 2009-065RC
In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperaives' Wheeling Rates (RSEC-WR) , with Prayer for the Issuance of a Provisional Authority
BUSECO
10/12/2009
 2009-062RC
In the Matter of the Application of (1.) Depreciated Replacement Cost of Applicant's Properties as of Dec. 31, 2008 and (2) Revised Rate Schedules to Achieve the Proposed Revenue Requirements in Accordance with the Provisions of R. A. 9136, with Prayer for the Issuance of a Provisional Authority
PECO
9/10/2009
 2009-061RC
In the Matter of the Application for the Approval of (1.) Sound Value Appraisal of Applicant's Assets as of 31 December 2008; and (2.) Revision of Rates to Achieve the Proposed Revenue Requirement in Accordance with the Provisions of R.A. 9136, with Prayer for the Issuance of a Provisional Authority
SFELAPCO
9/8/2009
 2009-060RC
In the Matter of the Application for the Approval of the Contract for the Supply of Electric Energy Between Masinloc Power Partners Co. Ltd. and Tarlac I Electrict Cooperative, Inc., with Prayer for the Issuance of a Provisional Authority
TARELCO/Masiloc Power Partners Co. Ltd.
9/3/2009
 2009-059RC
In the Matter of the Adoption of the Incremental Currency Exchange Rate Adjustment (5th ICERA) with Prayer for the Issuance of a Provisional Authority
NPC-SPUG
8/18/2009
 2009-058RC
In the Matter of the 5th Application for the Approval of the Generation Rate Adjustment under the GRAM Rules, with Prayer for the Issuance of a Provisional Authority
NPC-SPUG
8/18/2009
 2009-057RC
In the Matter of the Application for Approval of (A.) Maximum Average Price (MAP) for the Regulatory Year 2010; and (B.) Translation of the Maximum Average Price for Regulatory Year 2010 (RY2010) into a Distribution Rate Structure for its Various Customer Classes with Prayer for the Issuance of a Provisional Authority
MERALCO
8/7/2009
 2009-09RM
In the Matter of the Petition for the Issuance of "Guidelines to Govern the Submission, Evaluation and Approval of Lease of Property by Distribution Utilities PEPOA/MERALCO
7/31/2009
 2009-056
RC
In the Matter of the Application for the Recovery of Incremental Fuel and Independent Power Producers (IPP) Costs Under the Generation Rate Adjustment Mechanism (GRAM) with Prayer for Provisional Authority
NPC/PSALM
7/29/2009
 2009-055
RC
In the Matter of the 13th Application for the Recovery of the Incremental Costs on Foreign Currency Exchange Rate Fluctuations Under the Incremental Currency Exchange Rate Adjustment (ICERA) with Prayer for Provisional Authority
NPC/PSALM
7/29/2009
 2009-054
RC
In the Matter of the Application to Confirm Transmission Cost Over-and Under-Recoveries and Offset the Net Transmission Cost Over-Recoveries witht he Transmission Cost Underrecoveries Applied for Under ERC Case No. 2007-147RC, including Carrying Cost with Prayer for Provisional Authority
MERALCO
7/29/2009
 2009-049
RC
In the Matter of the Application of the National Grid Corporation of the Philippines for the Approval of Force Majeure (FM) Event Regulated FM Pass through for Typhoons "Cosme" and "Frank," and for Sabotage of Transmission Towers in Mindanao in Accordance with the Transmission Wheeling Rate Guidelines, with Prayer for Provisional Authority
NGCP
7/13/2009
 2009-048
RC
In the Matter of the Application for Approval of Overa-All Tariff Adjustment with Prayer for Issaunce of Provisional Authority
OMECO
7/1/2009
 2009-047
RC
Petition for the Recovery of National Power Corporation's Stranded Debts Portion of the Universal Charge for the Luzon, Visayas and Mindanao Grids
PSALM
6/30/2009
 2009-046
RC
Petition for the Recovery of National Power Corporation's Stranded Contract Costs Portion of the Universal Charge for the Luzon Grid
PSALM
6/30/2009
 2009-045
RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)
IEEC
6/25/2009
 2009-044
RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)
LUECO
6/19/2009
 2009-043
RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)
CELCOR
6/19/2009
 2009-042
RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)
TEI
6/19/2009
 2009-041
RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)
DLPC
6/15/2009
 2009-040
RC
In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme in Accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)
VECO
6/15/2009
 2009-039
RC
In the Matter of the Application for Approval of Over-All Tariff Adjustment, with Prayer for Issuance of Provisional Authority
ORMECO
6/15/2009
 2009-038
RC
In the Matter of the Application for Approval of the Power Supply Agreement Between Cagayan II Electric Cooperative, Inc. and SN Aboitiz Power-Magat, Inc. with Prayer for Provisional Authority
CAGELCO II/SNAP
5/28/2009
 2009-037
RC
In the Matter of the Application for Approval of the Power Supply Agreement Between Cagayan I Electric Cooperative, Inc. and SN Aboitiz Power-Magat, Inc. with Prayer for Provisional Authority
CAGELCO I/SNAP
5/28/2009
 2009-036
RC
In the Matter of the Application for Approval of the Power Supply Agreement Between Isabela II Electric Cooperative, Inc. and SN Aboitiz Power-Magat, Inc. with Prayer for Provisional Authority
ISELCO/SNAP
5/28/2009
 2009-035
RC
In the Matter of the Application for Approval of the Power Supply Agreement Between Ifugao Electric Cooperative, Inc. and SN Aboitiz Power-Magat, Inc. with Prayer for Provisional Authority
IFELCO/SNAP
5/28/2009
 2009-034
RC
In the Matter of the Application for Approval of the Power Supply Agreement Between Quirino Electric Cooperative, Inc. and SN Aboitiz Power-Magat, Inc. with Prayer for Provisional Authority
QUIRELCO
5/28/2009
 2009-033
RC
In the Matter of the Adoption of the Incremental Currency Exchange Rate Adjustment (4th ICERA)
NPC-SPUG
5/26/2009
 2009-032
RC
In the Matter of the 13th Application for the Recovery of Incremental Fuel and Independent Power Procedure (IPP) Costs Under the Generation Rate Adjustment Mechanism (GRAM) with Prayer for Provisional Authority (PA)
NPC-PSALM
5/25/2009
 2009-031
RC
In the Matter of the 12th Application for the Recovery of the Incremental Costs on Foreign Currency Exchange Rate Fluctuation Under the Incremental Currency Exchange Rate Adjustment (ICERA) with Prayer for Provisional Authority (PA)
NPC-PSALM
5/25/2009
 2009-029
RC
In the Matter of the Application for the Approval of the Ancillary Services Procurement Agreement (ASPA) Between the National Transmission Corporation (now National Grid Corporation of the Philippines) and the National Power Corporation with Prayer for the Issuance of Provisional Authority (PA)
NGCP
5/20/2009
 2009-028
RC
In the Matter of the Petition for the Availments from the Universal Charge of the Share for Missionary Electrification for the Period 2009-2013
NPC-SPUG
5/14/2009
 2009-027
RC
In the Matter of the Application for the Approval of the Contract for the Supply of Electricity between Montalban Methane Power Corporation (MMPC) and Manila Electric Company (MERALCO), with Prayer for  Provisional Authority
MERALCO
5/13/2009
 2009-024
RC
In the Matter of the Application for the Approval of the Revised Rate Schedule and Appraisal of Properties with Prayer for the Issuance of Provisional Authority (PA)
VECO
4/8/2009
 2009-023
RC
In the Matter of the Application for the Approval of the Transition Supply Contracts (TSCs) Entered Into With Distribution Utilities (DUs) Located in the Mindanao Grid with Prayer for the Issuance of Provisional Authority (PA)
NPC
4/8/2009
 2009-022
RC
In the Matter of the Application for Approval of (1) Sound Value Appraisal of Applicants Assets as of 31 December 2006 Including Additions and Retirements for the Years 2007 and 2008; and (2) Revision of Rates to Achieve the Proposed Revenue Requirement in Accordance with the Provisions of R.A. 9136, with Prayer for Provisional Authority
TEI
4/2/2009
 2009-021
RC
In the Matter of the Adoption of the Generation Rate Adjustment Mechanism (4th GRAM) with Prayer for Provisional Authority
NPC-SPUG
3/27/2009
 2009-020
RC
In the Matter of the Application for Authority to Recover from Consumers the 2008 Local Franchise Taxes Paid to the City of Lapu-Lapu and to Charge Consumers the New Local Franchise Tax Rate of the City of Lapu-Lapu, with Prayer for Provisional Authority
MECO
3/25/2009
 2009-019
RC
In the Matter of the Application for the Suspension of the Implementation of Table "B" Base Rates in the Order dated 5 July 2006 in ERC Case No. 2005-043RC, with Prayer for Provisional Authority
PPC-PECO
3/23/2009
 2009-018
RC
In the Matter of the Application for Approval of a) The Revised X-Factor for the Second Regulatory Period; b) Revised Smooth Maximum Average Price for the Second Regulatory Period; and c) the Translation into Distrubution Rate of the Different Customer Classes for the Third Regulatory Year of the ERC Approved Annual Revenue Requirement for DECORP Under the Performance Based Regulation (PBR) for the Regulatory Period 2007-2011
DECORP
3/20/2009
 2009-017
RC
In the Matter of the Application for the Approval of the (1) Revised X-Factor (2) SMAP for the 2nd Regulatory Period (SMAP2008) and (3) the Maximum Average Price of the 3rd Regulation Year of the 2nd Regulatory Period (MAP2010) and its Translation into Distribution Changes for Each Customer Class
CEPALCO
3/19/2009
 2009-016
RC
In the Matter of the Petition for the Availment of the Environmental Charge/Share from the Universal Charge for the Rehabilitation and Management of Watershed Areas, with Prayer for Provisional Authority
NPC
3/10/2009
 2009-015
RC
In the Matter of the Application for the Approval of the Pricing and Cost Recovery Methodology and the Structure and Level of Administration Fees with Prayer for Issuance of Provisional Authority for the Visayas Supply Augmentation Auction
DOE
3/6/2009
 2009-014 RC
In the Matter of the Application for the Approval of the Power Supply Agreement Executed by Peoples Energy Services, Inc. (PESI) and Camarines Sur III Electric Cooperative, Inc. (CASURECO III) **
CASURECO III
2/27/2009
 2009-013 RC
In the Matter of the Urgent Request for Approval of the Agreement on the Interim Rate Between Visayan Electric Company, Inc. and Toledo Power Company, with Prayer for Provisional Authority
VECO
2/27/2009
 2009-0012 RC
In the Matter of the Application for Approval of the Interruptible Load Agreement with Special Wholesale Power Customers within the Franchise Area with Prayer for Provisional Authority
VECO
2/23/2009
 2009-011 RC
In the Matter of the Application for Approval of the Amendment/Supplement to the Agreement for the Sale of Electric Energy (ASEE), Transmission Service Agreement (TSA) and Supplemental Memorandum of Agreement (MOA) to the NPC-MERALCO Power Supply Contract for the Power Requirements of Sunpower and the Supplemental Agreement Between Sunpower and MERALCO with Prayer for Provisional Authority
MERALCO
2/20/2009
 2009-010 RC
In the Matter of the Urgent Request for Approval of the Agreement on the Interim Rate Between Cebu III Electric Cooperative Inc. and Toledo Power Company, with Prayer for Provisional Authority
CEBECO III
2/20/2009
 2009-009 RC
In the Matter of the Application for Approval of the Translation Into Distribution Rates of Different Customer Classes for the First Regulatory Year of the ERC-Approved Annual Revenue Requirement for Iligan Light and power Inc. (ILPI) under the Performance Based Regulation (PBR) for the Regulatory Period 2010 - 2013
ILPI
2/6/2009
 2009-008 RC
In the Matter for Approval of the Annual Revenue In the Matter of the Application for Approval of the Translation Into Distribution Rates of Different Customer Classes for the First Regulatory Year of the ERC-Approved Annual Revenue Requirement for Mactan Electric Company, Inc. (MECO) under the Performance Based Regulation (PBR) for the Regulatory Period 2009 - 2013
MECO
2/6/2009
 2009-007 RC
In the Matter of the Application for Approval of the Ancillary Services Procurement Agreement Between the National Transmission Corporation and SN Aboittiz Power-Magat, Inc. with Prayer for Provisional Authority
TRANSCO
2/3/2009
 2009-006 RC
In the Matter of Application for Approval of the Translation Into Distribution Related Rates of Different Customer Classes for the First Regulatory Year of the ERC-Approved Annual Revenue Requirement for CLPC Under the Performance Based Regulation (PBR) for The Regulatory Period 2009-2013 with Prayer for Provisional Authority
CLPC
1/26/2009
 2009-005 RC
In the Matter of the Application for the Approval of the Electronic Ancillary Services Tendering (EAST) for the Administration of Ancillary Services in Luzon, Visayas and Mindanao with Prayer for Provisional Authority
NGCP
1/21/2009
 2009-004 RC
In the Matter of the Application for the Approval of the Proposed New Basic Generation Rates for Luzon, Visayas and Mindanao Grids with Prayer for Provisional Authority
NPC
1/16/2009
 2009-003 RC
In the Matter of the Application for the Approval of the Proposed Revised Plant Heat Rates for Luzon, Visayas and Mindanao Grids with Prayer for Provisional Authority
NPC
1/16/2009
 2009-002 RC
In the Matter of the Application for Approval of Over-All Tariff Adjustment, with Prayer for Issuance of Provisional Authority
SURNECO
1/9/2009
 2009-001 RC
In the Matter of the Application for the Approval of Connection Charges and Residual Subtransmission Charges for Calendar Year 2006 on the Excluded Services Covering the Existing Subtransmission Assets of the National Transmission Corporation (TRANSCO and Any Future Concessionaire Thereof, with Prayer for Provisional Authority
TRANSCO
1/8/2009