| Date |
Time |
Case No. |
Title |
February 2, 2010
(Tuesday) |
8:30AM |
2009-063MC
[PT][JU][EX][EV] CANCELLED |
In the Matter of the Application for the Approval of 3-Years Capital Expenditure Projects of ORMECO for the Year 2009 to 2011, with Prayer for Provisional Authority
Applicant: ORMECO
VENUE: ERC Hearing Room |
February 2, 2010
(Tuesday) |
8:30AM |
2009-066RC
[JU] |
In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: PELCO I
VENUE: ERC Hearing Room |
February 2, 2010
(Tuesday) |
8:30AM |
2009-090RC
[JU]
CANCELLED |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: ANECO
VENUE: ERC Hearing Room |
February 2, 2010
(Tuesday) |
9:00AM |
2008-066RC
[EV] |
TRANSCO
TITLE: 2008 Connection Charge & Residual Subtransmission Charges
VENUE: ERC Hearing Room |
February 2, 2010
(Tuesday) |
9:00AM |
2009-045RC
[PUBCON] |
IEEC
TITLE: RDWR
VENUE: Recto Gym, J. Pastor Street,
Poblacion, Ibaan, Batangas |
February 2, 2010
(Tuesday) |
9:00AM to 5:00PM |
2009-179RC
[JU][EX][PT]EV[] |
ILPI
TITLE: PBR (2009-2013)
VENUE: HRM Laboratory, 2nd Flr., St. Michael's College, Quezon Ave. corner Lluch St. Iligan City |
February 2, 2010
(Tuesday) |
2:00AM |
2009-101MC
[JU][EX][PT]EV[] |
TEAM (Philippines) Energy Corporation (TPEC)
TITLE: BSUP & ACAM
VENUE: ERC Hearing Room |
February 3, 2010
(Wednesday) |
9:00AM |
2009-153RC
[PT][JU][EX] |
NGCP
TITLE: 2009 Connenction Charges
VENUE: ERC Hearing Room |
February 3, 2010
(Wednesday) |
10:00AM |
2009-049RC
[PT][JU][EX] |
NGCP
TITLE: Force Majeure
VENUE: ERC Hearing Room |
February 3, 2010
(Wednesday) |
10:00AM |
2009-061RC
[EV] |
SFELAPCO
TITLE: Sound Value & Revision of Rates
VENUE: ERC Hearing Room |
February 3, 2010
(Wednesday) |
10:00AM to 5:00PM |
2009-074RC
[PT][JU][EX][EV] |
MARELCO
TITLE: Unbundled Rate
VENUE: MARELCO Conference Rm., Ihatub, Boac, Marinduque |
February 3, 2010
(Wednesday) |
11:00AM |
2009-160RC
[PT][JU][EX] |
NGCP
TITLE: MAR 2010
VENUE: ERC Hearing Room |
February 3, 2010
(Wednesday) |
2:00PM |
2009-153RC
[EV] |
NGCP
TITLE: 2009 Connection Charges
VENUE: ERC Hearing Room |
February 4, 2010
(Thursday) |
8:30AM to 5:00PM |
2009-074RC
[EV] |
MARELCO
TITLE: Unbundled Rate
VENUE: MARELCO Conference Rm., Ihatub, Boac, Marinduque |
February 4, 2010
(Thursday) |
9:00AM |
2009-049RC
[EV] |
NGCP
TITLE: Force Majeure
VENUE: ERC Hearing Room |
February 4, 2010
(Thursday) |
|
(PUBCON) |
Public Consultation on the Amendment of R.A. 7832 of the IRR, MAGNA CARTA & the Proposed Rules Governing the Type Approval of Meter Products to be used in Revenue Metering by DU's
VENUE: ERC Hearing Room |
February 4, 2010
(Thursday) |
2:00PM |
2009-160RC
[EV] |
NGCP
TITLE: MAR 2010
VENUE: ERC Hearing Room |
February 4, 2010
(Thursday) |
2:00PM |
2006-157MC
[CONFERENCE]
(Amicable Settlement) |
CIGI
TITLE: PSA
VENUE: ERC Hearing Room |
February 5, 2010
(Friday) |
2:00PM |
2009-0057RC
[MR]
|
MERALCO
TITLE: MAP 2010
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-073RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: AURELCO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-085RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: QUEZELCO II
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-089RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: QUIRELCO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-102RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: KAELCO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-103RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: CAMELCO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-108RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: LEYECO III
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-124RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: ASELCO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-127RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: SUKELCO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-131RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: MOELCI II
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-100RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: ABRECO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-132RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: NORECO I
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-130RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: GUIMELCO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-155RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: DORECO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-172RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: PANELCO I
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-085RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: QUEZELCO II
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-116RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: BATELEC I
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-073RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: AURELCO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
8:30AM |
2009-163RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: ZAMECO I
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-077RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:BILECO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-116RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: BATELEC I
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-076RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: CAGELCO I
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-095RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: CAGELCO II
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-156RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: CANORECO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-068RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: FIBECO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-168RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: FLECO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-107RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: ISELCO I
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-072RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: MORESCO II
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-149RC
[JU]
CANCELLED |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: NUVELCO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-086RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: PELCO II
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-136RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: SOLECO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-112RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: SURNECO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-129RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: ZAMCELCO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-079RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: PRESCO
VENUE: ERC Hearing Room |
February 8, 2010
(Monday) |
1:30PM |
2009-162RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: MOPRECO
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-090RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: ANECO
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-065RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: BUSECO
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-070RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: CEBECO I
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-144RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: DANECO
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-138RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: ESAMELCO
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-139RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: ILECO III
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-128RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: INEC
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-097RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: NEECO II - Area I
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-058MC
[JU][EX] [PT][EV] |
CAPEX
Applicant: OMECO
VENUE: A.V.A. Alfafara Room 20th Floor, Pacific Center |
February 9, 2010
(Tuesday) |
8:30AM |
2009-097RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: NEECO II - Area I
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-110RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: NORSAMELCO
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-096RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: PANELCO III
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-113RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: SAJELCO
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-083RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: SAMELCO II
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-118RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: TARELCO II
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
8:30AM |
2009-082RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: ZAMSURECO I
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-165RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: BENECO
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-143RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: CASURECO II
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-069RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: CEBECO II
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-071RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: CEBECO III
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-167RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: CENECO
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-133RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: DORELCO
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-145RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: MOELCO I
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-092RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: SAMELCO I
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-142RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: SOCOTECO I
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-150RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: SOCOTECO II
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-123RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: SORECO I
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-101RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: SORECO II
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-093RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: SURSECO I
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-154RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: SURSECO II
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2009-164RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: BATELEC II
VENUE: ERC Hearing Room |
February 9, 2010
(Tuesday) |
1:30PM |
2006-0063RMC
[JU][EX][PT][EV]
CANCELLED |
OMECO
TITLE: CAPEX
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
|
2009-115MC
[PT][JU][EX][EV]
|
TEI
TITLE:CAPEX
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
8:30AM |
2009-080RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: BOHECO II
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
8:30AM |
2009-134RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: CASURECO III
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
8:30AM |
2009-159RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: ISELCO II
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
8:30AM |
2009-146RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: LANECO
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
8:30AM |
2009-094RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant: LUELCO
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-111RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:LEYECO II
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-151RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:LEYECO IV
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-158RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:Misamis Oriental Cooperative I Rural Electric Service Cooperative, Inc.
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-104RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:PENELCO
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-084RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:SIARELCO
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-121RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:ZAMSURECO II
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-120RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:ZANECO
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-157RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:AKELCO
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-106RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:ALECO
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-122RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:ANTECO
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-098RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:BOHECO I
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-170RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:CAPELCO
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-081RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:CASURECO I
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-171RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:CASURECO IV
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-148RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:CENPELCO
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-137RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:DASURECO
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-135RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:ILECO I
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-119RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:ILECO II
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-088RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:ISECO
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-147RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:LEYECO V
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-099RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:NEECO I
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-115RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:NEECO II - Area 2
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-109RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:NOCECO
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-091RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:NORECO II
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-117RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:QUEZELCO I
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-144RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:TARELCO I
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
1:30PM |
2009-125RC
[JU] |
In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules for Setting Electric Cooperatives Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority
Applicant:VRESCO
VENUE: ERC Hearing Room |
February 10, 2010
(Wednesday) |
|
2009-116MC
[JU][EV][PT][EV]
|
SURSECO I
TITLE:CAPEX
VENUE: ERC Hearing Room |
February 11, 2010
(Thursday) |
|
|
NGCP
TITLE:RTWR
VENUE: ERC (VFO), Cebu City |
February 11, 2010
(Thursday) |
|
|
SFELAPCO
TITLE:Sound Value & Revision of Rates
VENUE: ERC Hearing Room |
February 11, 2010
(Thursday) |
|
|
LKY RESORT AND HOTEL
TITLE:Direct Connection
VENUE: ERC Hearing Room |
February 12, 2010
(Friday) |
|
|
NGCP
TITLE:RTWR
VENUE: ERC (VFO), Cebu City |
February 15, 2010
(Monday) |
|
|
NGCP
TITLE:RTWR
VENUE: ERC Hearing Room |
February 16, 2010 (Tuesday) |
|
|
NGCP
TITLE:RTWR
VENUE: ERC Hearing Room |
February 16, 2010
(Tuesday) |
|
|
RIVPO
TITLE:Direct Connection
VENUE: ERC Hearing Room |
February 16, 2010 (Tuesday) |
|
|
TRANSCO & SORECO I
TITLE:Sales of Subtransmission
VENUE: ERC Hearing Room |
February 17, 2010 (Wednesday) |
|
|
NGCP
TITLE:RTWR
VENUE: ERC Hearing Room |
February 17, 2010 (Wednesday) |
|
|
NGCP
TITLE:RTWR
VENUE: ERC Hearing Room |
February 17, 2010 (Wednesday) |
|
|
ZAMECO II
TITLE:RSEC-WR
VENUE: ERC Hearing Room |
February 17, 2010 (Wednesday) |
|
|
TRC, et. al. vs. PELCO II, NPC, PSALM and NGCP
TITLE:Petition for Direct Connection
VENUE: ERC Hearing Room |
February 17, 2010
(Wednesday) |
|
|
TRC
TITLE: Direct Connection
VENUE: ERC Hearing Room |
February 18, 2010 (Thursday) |
|
2009-177RC
[JU][EX][PT][EV]
|
ISELCO II
TITLE:CAPEX
VENUE: ISELCO II's Main Office |
February 18, 2010 (Thursday) |
|
|
ZAMECO II
TITLE:RSEC-WR
VENUE: ERC Hearing Room |
February 18, 2010
(Thursday) |
|
|
NGCP
TITLE:RTWR
VENUE: ERC (MFO), Davao City |
February 19, 2010 (Friday) |
|
|
ISELCO II
TITLE:CAPEX
VENUE: ISELCO II's Main Office |
February 19, 2010 (Friday) |
|
|
NGCP
TITLE:RTWR
VENUE: ERC (MFO), Davao City |
February 22, 2010
(Monday) |
|
|
THERMA LUZON, Inc. vs. NGCP
TITLE:Direct Connection
VENUE: ERC Hearing Room |
February 23, 2010
(Tuesday) |
|
2010-009RC
[JU][EX][PT][EV]
|
NGCP & GNPOWER
TITLE:Construction of the Connection Assets
VENUE: Function Rm. Romalaine Seafood Restaurant & Leisure Park, Roman Highway, Alas-asin, Mariveles, Bataan |
February 23, 2010
(Tuesday) |
|
2009-046RC
[JU][EX][PT][EV]
|
PSALM
TITLE:Stranded Contract Costs
VENUE: ERC Hearing Room |
February 23, 2010 (Tuesday) |
|
|
NUVELCO
TITLE:PSA
VENUE: ERC Hearing Room |
February 23, 2010
(Tuesday) |
|
|
CIGI
TITLE:RSEC-WR
VENUE: ERC Hearing Room |
February 23, 2010 (Tuesday) |
|
2009-104MC
[JU][EX][PT][EV]
|
MOELCI II
TITLE:CAPEX
VENUE: ERC Hearing Room |
February 24, 2010 (Wednesday) |
|
|
TRANSCO AND VRESCO
TITLE:Sale of Sub Transmission
VENUE: ERC Hearing Room |
February 24, 2010
(Wednesday) |
|
2010-009RC
[JU][EX][PT][EV]
CANCELLED
|
NGCP & GNPOWER
TITLE:Construction of the Connection Assets
VENUE: Function Rm. Romalaine Seafood Restaurant & Leisure Park, Roman Highway, Alas-Asin, Mariveles Bulacan |
February 24, 2010 (Wednesday) |
|
2009-055MC
[EV]
CANCELLED
|
SFELAPCO
TITLE:CAPEX
VENUE: ERC Hearing Room |
February 25, 2010
(Thursday) |
|
|
NGCP
TITLE:MAR -3rd Regulatory Period (2011 to 2015)
VENUE: ERC Hearing Room |
February 25, 2010 (Thursday) |
|
|
NPC
TITLE:Supplemental Petition
VENUE: ERC Hearing Room |
February 26, 2010
(Friday) |
|
|
NGCP
TITLE:MAR -3rd Regulatory Period (2011 to 2015)
VENUE: ERC Hearing Room |
February 26, 2010 (Friday) |
|
2009-001RC
[JU][EX][PT][EV]
|
CELCO
TITLE:Rate Adjustments
VENUE: CELCO Main Office, Western Poblacion, Poro, Camotes, Cebu |
February 26, 2010 (Friday) |
|
|
MERALCO
TITLE:Confirmation of Transmission Cost over and under recoveries & Offsetting the net over-recoveries with net under-recoveries
VENUE: ERC Hearing Room |