The hearing and mediation schedules are updated and posted weekly. Changes due to settlement, withdrawals and adjournments may take place prior to the actual hearing or mediation dates. It is therefore recommended that you confirm with the hearing and mediation officers whether a particular hearing or mediation is to proceed as scheduled. For confirmation of hearing schedule, please contact the Legal Service at (63-2) 638-4517, E-mail: legal@erc.gov.ph.

February 2009

Date

Time

Case No.

Title

February 2, 2009
(Monday)
2:00PM
2007-0490MC
[PT][EV]
In the Matter of the Applicant for the Approval of the Sale of Sub-transmission Lines/Assets within the Franchise Area of Mactac Electric Company, Inc. (MECO)
Applicant: TRANSCO
VENUE: ERC Hearing Room
February 2, 2009
(Monday)
3:00PM
2008-0084MC
[CH]
In the Matter of the Petition for Direct Connection with the National Power Corporation (NPC) and the National Transmission Corporation (TRANSCO) with Prayer for Provisional Authority
VENUE: ERC Hearing Room
February 3, 2009
(Tuesday)

9:00AM to 03:30PM

2008-0038RC
[EV]
In the Matter of the Application for Prior Verification of Other Generation Rates Adjustments under Section 3, Article IV of the Guidelines for the Automatic Adjustment of Generation rates and System Loss Rates by Distribution Utilities, with Prayer for Provisional Authority
Applicant: PECO
VENUE: ILOILO CITY
February 3, 2009
(Tuesday)
9:00AM
2007-0490MC
[PT][EV]
CANCELLED
In the Matter of the Applicant for the Approval of the Sale of Sub-transmission Lines/Assets within the Franchise Area of Mactac Electric Company, Inc. (MECO)
Applicant: TRANSCO
VENUE: ERC Hearing Room
February 4, 2009
(Wednesday)
10:00AM
2008-0063 MC
[PT][JU]
In the Matter of the 12th Application for the Recovery of Incremental Fuel and Independent Power Producer (IPP) Costs under the Generation Rate Adjustment Mechanism (GRAM) with Prayer for Provisional Authority (PA)
Applicant: NPC
VENUE: ERC Hearing Room
February 4, 2009
(Wednesday)
10:00AM
2008-0064 MC
[PT][JU]
In the Matter of the 11th Application for the Recovery of the Incremental Costs on Foreign Currency Exchange Rate Fluctuations under the Incremental Currency Exchange Rate Adjustment (ICERA) with Prayer for Provisional Authority (PA)
Applicant: NPC
VENUE: ERC Hearing Room
February 4, 2009
(Wednesday)
2:00PM
2007-0490 MC
[PT][JU][EV]
In the Matter of the Applicant for the Approval of the Sale of Sub-transmission Lines/Assets within the Franchise Area of Mactac Electric Company, Inc. (MECO)
Applicant: TRANSCO
VENUE: ERC Hearing Room
February 5, 2009
(Thursday)
9:00AM
2008-0033MC
[EV]
In the Matter of the Petition for Dispute Resolution on the Classification of an Asset of the National Transmission Corporation (TRANSCO)
Applicant: VECO
VENUE: ERC Hearing Room
February 5, 2009
(Thursday)
10:00AM
2006-147MC
[EV]
In The Matter Of The Petition For Direct Connection With The National Power Corporation And National Transmission Corporation
Applicant: VICSAL DEVELOPMENT CORPORATION
VENUE: ERC Hearing Room
February 5, 2009
(Thursday)
11:00AM
2003-150
[EV]
Visayan Electric Company, Inc. Versus National Power Corporation and Grand Cement Manufacturing Corporation
Applicant: VECO
VENUE: ERC Hearing Room
February 6, 2009
(Friday)
9:00AM
2008-066RC
[EV][PT][EX]
In the Matter of the Application for the Approval of Connection Charge and Residual Subtransmission Charges for Calendar Year 2008 on the Excluded Services Covering the Existing Subtransmission Assets of the National Transmission Corporation (TRANSCO) and Any Future Concessionaire Thereof, with Prayer for Provisional Authority
Applicant: TRANSCO
VENUE: ERC Hearing Room
February 6, 2009
(Friday)
11:00AM
2006-147MC
[EV]
In The Matter Of The Petition For Direct Connection With The National Power Corporation And National Transmission Corporation
Applicant: VICSAL DEVELOPMENT CORPORATION
VENUE: ERC Hearing Room
February 6, 2009
(Friday)
2:00PM
2008-066RC
[EV][PT][EX]
In the Matter of the Application for the Approval of Connection Charge and Residual Subtransmission Charges for Calendar Year 2008 on the Excluded Services Covering the Existing Subtransmission Assets of the National Transmission Corporation (TRANSCO) and Any Future Concessionaire Thereof, with Prayer for Provisional Authority
Applicant: TRANSCO
VENUE: ERC Hearing Room
February 9, 2009
(Monday)
2:00PM
2008-102 MC
[EV]
In re: Petition for Direct Connection with the National Power Corporation (NPC) and the National Transmission Corporation (TRANSCO) with Prayer for Provisional Authority
Applicant: Formosa Ceramic Tiles Manufacturing Corporation
VENUE: ERC Hearing Room
February 9, 2009
(Monday)
2:00PM
2008-083 MC
[EV]

MERALCO
vs.
PEMC, TRANSCO, NPC & PSALM

TITLE: Petition for Dispute Resolution
VENUE: ERC Hearing Room

February 10, 2009
(Tuesday)
9:00AM
2006-157 MC
CONFERENCE
PETITION FOR THE APPROVAL OF POWER SUPPLY AGREEMENT WITH THE NATIONAL POWER CORPORATION AND TRANSMISSION SERVICE AGREEMENT WITH THE NATIONAL TRANSMISSION CORPORATION WITH PRAYER FOR PROVISIONAL AUTHORITY AND/OR WRIT OF PRELIMINARY INJUNCTION
Applicant: CONSOLIDATED INDUSTRIAL GASES, INC.
VENUE: ERC Hearing Room
February 10, 2009
(Tuesday)
9:00AM
2008-0112 MC
[PT][JU][EV]
In the Matter of the Application for the Approval of the Replacement of the Existing Transformers of the San Jose Substation of the National Transmission Corporation, and for Provisional Authority
Applicant: TRANSCO
VENUE: ERC Hearing Room
February 10, 2009
(Tuesday)
10:30AM
2008-0113 MC
[PT][JU][EV]
In the Matter of the Application for the Approval of the Procurement to a 300 MVA Transformer for Araneta Substation of the National Transmission Corporation, and for Provisional Authority
Applicant: TRANSCO
VENUE: ERC Hearing Room
February 10, 2009
(Tuesday)
2:00PM
2008-060RC
[PT][JU]
In the Matter of the Application for (a) Extension of Power Purchase Agreement (PPA); and (b) Approval of Amended Electric Power Purchase Agreement (EPPA) Entered Into by and Between Tarlac Electric Inc. (TEI) and Tarlac Power Corporation (TPC), with Prayer for Provisional Authority
Applicant: TEI
VENUE: TEI Conference Room, Tarlac Electric, Incorporated, Angeles City
February 10, 2009
(Tuesday)
2:00PM
2008-0114 MC
[PT][JU][EV]
In the Matter of the Application for the Approval of the Capital Projects of Misamis Oriental Rural Electric Service Cooperative-1 (MORESCO I) for the Year 2009, with Provisional Authority
Applicant: MORESCO I
VENUE: ERC Hearing Room
February 10, 2009
(Tuesday)
2:30PM
2008-061RC
[PT][JU][EX]
in the Matter of the Application of the National Transmission Corporation or its Concessionaire for the Approval of Force Majeure (FM) Event Regulated FM Pass Through for Mindanao Tower Sabotage Accordance with the Transmission Wheeling Rate Guidelines with Prayer for Provisional Authority
Applicant: TRANSCO
VENUE: ERC Mindanao Field Office (MFO), Mezzanine Flr., Mintrade Bldg., Moteverde cor. Sales St., Davao City
February 11, 2009
(Wednesday)
9:00AM
2008-0103 MC
[PT][JU][EX][EV]
In the Matter of the Application for the Approval of the Sale of Various Subtransmission Lines/Assets of the National Transmission Corporation (TRANSCO ) to Batangas I Electric Cooperative, Inc. (BATELEC I) as Covered by a Lease of Purchase Agreement
Applicant: BATELEC I
VENUE: ERC Hearing Room
February 11, 2009
(Wednesday)
9:00AM TO 3:00PM
2008-0061RC
[EV]
In the Matter of the Application of the National Transmission Corporation or its Concessionaire for the Approval of Force Majeure (FM) Event Regulated FM Pass Through for Mindanao Tower Sabotage Accordance with the Transmission Wheeling Rate Guidelines with Prayer for Provisional Authority
Applicant: TRANSCO
VENUE: ERC Hearing Room
February 11, 2009
(Wednesday)
2:00PM
2008-086MC
[PT]
In the Matter of the Petition/Application for Direct Connection with the National Power Corporation (NPC) and the National Transmission Corporation (TRANSCO) with Prayer for Provisional Authority
Applicant: Lky Resort and Hotel, Inc.
VENUE: ERC Hearing Room
February 11, 2009
(Wednesday)
10:00AM
2008-060 RC
[EV]
In the Matter of the Application for (a) Extension of Power Purchase Agreement (PPA); and (b) Approval of Amended Electric Power Purchase Agreement (EPPA) Entered Into by and Between Tarlac Electric Inc. (TEI) and Tarlac Power Corporation (TPC), with Prayer for Provisional Authority
Applicant: TEI
VENUE: TEI Conference Room, Tarlac Electric, Incorporated, Angeles City
February 11, 2009
(Wednesday)
2:00PM
2008-0104MC
[EV][PT][JU][EX]

In the Matter of the Petition for Direct Connection with the National Power Corporation (NPC) and the National Transmission Corporation (TRANSCO) with Prayer for Provisional Authority and Issuance of a Temporary Mandatory Order and/or a Writ of Preliminary Injunction
Applicant: CAPASCO
VENUE: ERC Hearing Room

February 11, 2009
(Wednesday)
2:00PM
2008-0003MC
[EV][PT][JU][EX]

In the Matter of the Application for Approval of Major Electric Distribution Capital Projects CY2009 within Franchise Area, with Prayer for a Provisional Authority
Applicant: BLCI
VENUE: Board Room

February 12, 2009
(Thursday)
10:00AM
2008-062 MC
[EV]
In the Matter of the Application for the Adoption of the Same Billing Methodology Approved for SKK Steel Corporation and Stronghold Steel Corporation by the National Transmission Corporation, With Prayer for Issuance of Provisional Authority
Applicant: Melters Steel corporation (MSC)
VENUE: Legal Conference
February 12, 2009
(Thursday)
11:00AM
2008-063 MC
[EV]
In the Matter of the Application for the Adoption of the Same Billing Methodology Approved for SKK Steel Corporation and Stronghold Steel Corporation by the National Power Corporation, With Prayer for Issuance of Provisional Authority
Applicant: Melters Steel corporation (MSC)
VENUE: Legal Conference Area
February 12, 2009
(Thursday)
09:00AM
2008-0106 MC
[PT][JU]
In the Matter of the Application for the Approval of SORECO II Major Capital Projects, namely : 1) The Rehabilitation of the Power Distribution System; 2) The Distribution Load Improvement of Various Sections of Distribution System; and 3) Operation and Maintenance (O&M) Enhancement, with Prayer for Provisional Authority
Applicant: SORECO II
VENUE: ERC Hearing Room
February 12, 2009
(Thursday)
09:00AM
2008-0066RC
[PT][JU][EX]
CANCELLED
In the Matter of the Application for the Approval of Connection Charge and Residual Subtransmission Charges for Calendar Year 2008 on the Excluded Services Covering the Existing Subtransmission Assets of the National Transmission Corporation (TRANSCO) and Any Future Concessionaire Thereof, with Prayer for Provisional Authority
Applicant: TRANSCO
VENUE: ERC Mindanao Field Office (MFO), Mezzanine Flr., Mintrade Bldg., Moteverde cor. Sales St., Davao City
February 12, 2009
(Thursday)
2:00PM
2008-0066RC
[PT][JU][EX]
CANCELLED
In the Matter of the Application for the Approval of Connection Charge and Residual Subtransmission Charges for Calendar Year 2008 on the Excluded Services Covering the Existing Subtransmission Assets of the National Transmission Corporation (TRANSCO) and Any Future Concessionaire Thereof, with Prayer for Provisional Authority
Applicant: TRANSCO
VENUE: ERC Mindanao Field Office (MFO), Mezzanine Flr., Mintrade Bldg., Moteverde cor. Sales St., Davao City
February 12, 2009
(Thursday)
10:00AM
2008-107RC
[PT][JU]
In the Matter of the Petition for Dispute Resolution
Applicant: Northwind Power Development Corporation (NORTHWIND)
VENUE: ERC Hearing Room
February 12, 2009
(Thursday)
10:00AM
2008-063MC
[EV]
In the Matter of the Application for the Adoption of the Same Billing Methodology Approved for SKK Steel Corporation and Stronghold Steel Corporation by the National Power Corporation, With Prayer for Issuance of Provisional Authority
Applicant: Melters Steel corporation (MSC)
VENUE: Legal Conference Area
February 12, 2009
(Thursday)
02:00PM
2008-0066RC
[PT][JU][EX]
In the Matter of the Application for the Approval of Connection Charge and Residual Subtransmission Charges for Calendar Year 2008 on the Excluded Services Covering the Existing Subtransmission Assets of the National Transmission Corporation (TRANSCO) and Any Future Concessionaire Thereof, with Prayer for Provisional Authority
Applicant: TRANSCO
VENUE: ERC Mindanao Field Office (MFO), Mezzanine Flr., Mintrade Bldg., Moteverde cor. Sales St., Davao City
February 12, 2009
(Thursday)
02:00PM
2008-0106 MC
[PT][JU]
In the Matter of the Application for the Approval of SORECO II Major Capital Projects, namely : 1) The Rehabilitation of the Power Distribution System; 2) The Distribution Load Improvement of Various Sections of Distribution System; and 3) Operation and Maintenance (O&M) Enhancement, with Prayer for Provisional Authority
Applicant: SORECO II
VENUE: ERC Hearing Room
February 12, 2009
(Thursday)
02:00PM
2009-0002 MC
[PT][JU]
In the Matter of the Petition for Dispute Resolution
Applicant: Southern Philippines Power Corporation (SPPC)
VENUE: ERC Hearing Room
February 12, 2009
(Thursday)
02:00PM
2009-005 RC
[PT][JU][EX]
In the Matter of the Application for the Approval of the Electronic Ancillary Services Tendering (EAST) for the Administration of Ancillary Services in Luzon, Visayas and Mindanao with Prayer for Provisional Authority
Applicant: NGCP
VENUE: ERC Mindanao Field Office (MFO), Mezzanine Flr., Mintrade Bldg., Moteverde cor. Sales St., Davao City
February 12, 2009
(Thursday)
03:00PM
2009-0058 MC
[CH]
In the Matter of the Application for Authority to Source Power from the National Power Corporation (NPC) through the Transmission Lines of the National Transmission Corporation (TRANSCO) and/or the Manila Electric Company (MERALCO) Subtranmission Lines or Distribution Lines. with Prayer for the Issuance of a Provisional Authority
Applicant: Care 1st Corporation
VENUE: ERC Hearing Room
February 13, 2009
(Friday)
02:00PM
2009-005 RC
[EV]
In the Matter of the Application for the Approval of the Electronic Ancillary Services Tendering (EAST) for the Administration of Ancillary Services in Luzon, Visayas and Mindanao with Prayer for Provisional Authority
Applicant: NGCP
VENUE: ERC Mindanao Field Office (MFO), Mezzanine Flr., Mintrade Bldg., Moteverde cor. Sales St., Davao City
February 16, 2009
(Monday)
02:00PM
2009-005 RC
[PT][JU][EX][EV]
In the Matter of the Application for the Approval of the Electronic Ancillary Services Tendering (EAST) for the Administration of Ancillary Services in Luzon, Visayas and Mindanao with Prayer for Provisional Authority
Applicant: NGCP
VENUE: ERC Hearing Room
February 18, 2009
(Wednesday)
09:00AM
2008-0066RC
[PT][JU][EX]
CANCELLED
In the Matter of the Application for the Approval of Connection Charge and Residual Subtransmission Charges for Calendar Year 2008 on the Excluded Services Covering the Existing Subtransmission Assets of the National Transmission Corporation (TRANSCO) and Any Future Concessionaire Thereof, with Prayer for Provisional Authority
Applicant: TRANSCO
VENUE: ERC Visayas Field Office, Ground Floor, Machay Building, Gorordo Avenue, Cebu City
February 18, 2009
(Wednesday)
02:00PM
2009-005 RC
[JU][EX][PT]
In the Matter of the Application for the Approval of the Electronic Ancillary Services Tendering (EAST) for the Administration of Ancillary Services in Luzon, Visayas and Mindanao with Prayer for Provisional Authority
Applicant: NGCP
VENUE: ERC Visayas Field Office, Ground Floor, Machay Building, Gorordo Avenue, Cebu City
February 18, 2009
(Wednesday)
02:00PM
2008-0066RC
[PT][JU][EX]
CANCELLED
In the Matter of the Application for the Approval of Connection Charge and Residual Subtransmission Charges for Calendar Year 2008 on the Excluded Services Covering the Existing Subtransmission Assets of the National Transmission Corporation (TRANSCO) and Any Future Concessionaire Thereof, with Prayer for Provisional Authority
Applicant: TRANSCO
VENUE: ERC Visayas Field Office, Ground Floor, Machay Building, Gorordo Avenue, Cebu City
February 19, 2009
(Thursday)
10:00AM
2008-111MC
[PT][JU]
CANCELLED
In the Matter of the Disputed Billing Error of the National Power Corporation with Prayer for Issuance of a Cease and Desist Order
Applicant: SUKELCO
VENUE: ERC Hearing Room
February 19, 2009
(Thursday)
02:00PM
2009-005 RC
[EV]
In the Matter of the Application for the Approval of the Electronic Ancillary Services Tendering (EAST) for the Administration of Ancillary Services in Luzon, Visayas and Mindanao with Prayer for Provisional Authority
Applicant: NGCP
VENUE: ERC Visayas Field Office, Ground Floor, Machay Building, Gorordo Avenue, Cebu City
February 19, 2009
(Thursday)
2:00AM
2008-111MC
[PT][JU]
CANCELLED
In the Matter of the Disputed Billing Error of the National Power Corporation with Prayer for Issuance of a Cease and Desist Order
Applicant: SUKELCO
VENUE: ERC Hearing Room
February 19, 2009
(Thursday)
02:00PM
2008-086 MC
[PT]
In the Matter of the Petition/Application for Direct Connection with the National Power Corporation (NPC) and the National Transmission Corporation (TRANSCO) with Prayer for Provisional Authority
Applicant: Lky Resort and Hotel, Inc.
VENUE: ERC Hearing Room
February 20, 2009
(Friday)
9:00AM to 05:00PM
2008-008 RC
[EV][JU][PT][EX]
PBR for the Regulatory Period 2009-2013
Applicant: Mactan Elec. Co., Inc. (MECO)
VENUE: Computer Room, Marigondon National High School, Brgy. Marigondon, Lapu-lapu City, Cebu
February 20, 2009
(Friday)
02:00PM
2008-042 MC
[EV]
In the Matter of the Application for Direct Connection with the National Power Corporation (NPC) and the National Transmission Corporation (TRANSCO) with Prayer for Provisional Authority and Issuance of a Temporary Mandatory Order and/or a Writ of Preliminary Injunction
Applicant: RJS Commodities Incorporated
VENUE: Legal Conference Area
February 23, 2009
(Monday)
10:00AM
2008-063RC
[PT][EV]
12th GRAM
Applicant: NPC & PSALM
VENUE: ERC Hearing Room
February 23, 2009
(Monday)
10:00AM
2008-064RC
[PT][EV]
12th ICERA
Applicant: NPC & PSALM
VENUE: ERC Hearing Room
February 23, 2009
(Monday)
02:00PM Onwards
2009-001RM
Pubcon
In the Matter of the Petition for the Adoption of Proposed Assets Valuation Guidelines (PSALM - Petitioner)
VENUE: ERC Hearing Room
February 23, 2009
(Monday)
02:00PM
2008-107MC
In the Matter of the Petition for Dispute Resolution
Applicant: Northwind Power Development Corporation (NORTHWIND)
VENUE: Board Room Room
February 24, 2009
(Tuesday)
09:00AM
2009-004RC
[PT][JU][EX]
In the Matter of the Application for the Approval of the Proposed New Basic Generation Rates for Luzon, Visayas and Mindanao Grids with Prayer for Provisional Authority
Applicant: NPC
VENUE: ERC Hearing Room
February 24, 2009
(Tuesday)
02:00PM
2008-0108MC
[PT]
In the Matter of the Application for the Approval of the Sale of Various Subtransmission Lines/Assets of the National Transmission Corporation (TRANSCO ) to Camarines Norte Electric Cooperative, Inc. (CANORECO) as Covered by a Lease of Purchase Agreement
Applicant: TRANSCO
VENUE: ERC Hearing Room
February 24, 2009
(Tuesday)
02:00PM
2009-002RM
[JU][PT]
MASINLOC Power Partners, INC.
TITLE: Petition for the Ammendment of ERC Resolution No.16,
Series of 2008

VENUE: ERC Hearing Room
February 24, 2009
(Tuesday)
03:00PM
2008-0109MC
[PT]

In the Matter of the Application for the Approval of the Sale of Various Subtransmission Lines/Assets of the National Transmission Corporation (TRANSCO ) to Leyte V Electric Cooperative, Inc. (LEYECO V) as Covered by a Lease of Purchase Agreement
Applicant: TRANSCO
VENUE: ERC Hearing Room
February 25, 2009
(Wednesday)
9:00AM
2008-099MC
[JU] [PT]
Emergency CAPEX
Applicant: ROMELCO
VENUE: ERC Board Room
February 25, 2009
(Wednesday)
9:00AM
2008-100MC
[JU] [PT]
Major CAPEX
Applicant: ROMELCO
VENUE: ERC Board Room
February 25, 2009
(Wednesday)
02:00PM
2009-004MC
[PT][JU][EX]
In the Matter of the Application for the Approval of the Proposed New Basic Generation Rates for Luzon, Visayas and Mindanao Grids with Prayer for Provisional Authority
Applicant: NPC
VENUE: Sequiaoa Inn, Function Room, Ground floor, Monteverde St., Davao City
February 26, 2009
(Thursday)
9:00AM
2009-004RC
[EV]
In the Matter of the Application for the Approval of the Proposed New Basic Generation Rates for Luzon, Visayas and Mindanao Grids with Prayer for Provisional Authority
Applicant: NPC
VENUE: Sequiaoa Inn, Function Room, Ground floor, Monteverde St., Davao City
February 26, 2009
(Thursday)
02:00PM
2008-098MC
[EV]
In the Matter of the Petition for Temporary Suspension of the Existing Billing Arrangement with the National Transmission Corporation (TRANSCO) under the Contract for Supply of Electric Energy (CSEE) for a Period of Four (4) Months, with Prayer for Issuance of Provisional Authority
Applicant: SKK Steel Corporation
VENUE: ERC Hearing Room
February 26, 2009
(Thursday)
02:00PM
2009-002MC
[EV]
Petition for Dispute Resolution
Applicant:Southern Philipines Power Corporation vs. NPC
VENUE: ERC Hearing Room
February 27, 2009
(Friday)
09:00PM
2008-0062RC
[CH]
In the Matter of the Application for Approval of the Ancillary Services Procurement Agreement (ASPA) Between the National Transmission Corporation (TRANSCO) and Angeles Electric Corporation (AEC) with Prayer for Provisional Authority
Applicant: AEC
VENUE: ERC Hearing Room
February 27, 2009
(Friday)
1:30PM
2008-0060C
[CH]
In the Matter of the Application for (a) Extension of Power Purchase Agreement (PPA); and (b) Approval of Amended Electric Power Purchase Agreement (EPPA) Entered Into by and Between Tarlac Electric Inc. (TEI) and Tarlac Power Corporation (TPC), with Prayer for Provisional Authority
Applicant: TEI
VENUE: ERC Hearing Room


Applications/pleadings filed with the Legal Service of the ERC are scheduled for Hearing after initial technical evaluation on the application/pleading and preliminary conference to simplify issues.

Period of the hearing is dependent on the following:

  • number of witnesses to be presented by the applicant;
  • number of oppositors;
  • the number of witnesses to be presented by each oppositor;
  • number of pleadings to be filed;
  • motions for postponements to be filed by both the applicant and the oppositors;
    other motions to be filed by both the applicant and the oppositors; and
  • submission of documents by both the applicant and the oppositors.

A Decision will be issued after the final technical evaluation on the application.

/