ORDER: IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE MAXIMUM ANNUAL REVENUE FOR THE THIRD REGULATORY PERIOD (2011 TO 2015) OF THE NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) DURING THE REGULATORY RESET PROCESS FOR THE THIRD REGULATORY PERIOD IN ACCORDANCE WITH THE ALTERNATIVE FORM OF RATE SETTING METHODOLOGY UNDER THE RULES IN SETTING THE TRANSMISSION WHEELING RATES (RTWR). NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP), Applicant.

On July 15, 2010, the Commission issued a Draft Determination on the instant application, which was subjected to public consultations on August 17, 18 and 20, 2010 in Davao City, Pasig City and Cebu City, respectively.

Subsequently, on August 31, 2010, the Commission issued an additional Performance Incentive Scheme (PIS) Indicator intended to be an integral part of the Draft Determination (copy hereto attached).

Relative thereto, all parties of record are hereby directed to SUBMIT their respective comments on the said additional PIS Indicator on or before September 20, 2010.

SO ORDERED.

Pasig City, September 9, 2010.

 Additional PIS Indicators.doc

BACK TO NEWS ARCHIVE