ERC to amend the Philippine Grid Code
ERC will be holding a public consultation on the proposed Amendments to the Philippine Grid Code. It will be held at the ERC Hearing Room on May 5 and 6, 2005 from nine o'clock (9:00 AM) in the morning to four o'clock (4:00 PM) in the afternoon.
The Philippine Grid Code establishes the basic rules, procedures, requirements and standards that govern the operation, maintenance and development of the high voltage back bone transmission system in the Philippines.
Notice
ERC Case No. 2005-07 RM
First
Amendment to the Philippine Grid Code
April 5 , 2005