Issuances

A compilation of ERC guidelines, rules, regulations, procedures, decisions, orders and resolutions. For other issuances not included in this section, please contact the Office of General Counsel and Secretariat at tel. no. (63-2) 631-5806, E-mail: mccgines@erc.gov.ph

RESOLUTIONS, RULES & REGULATIONS
RESOLUTIONS 
1. A Resolution Adopting the Rules to Govern the Interruptible Load Program (ILP) of Distribution Utilities (DUs) (3/15/2010)
2. Resolution No. 06, Series of 2010, A Resolution Directing All Distribution Utilities to Remit their Respective Proportionate Shares to the Distribution Management Committee’s 2010 Budget (3/11/2010)
3. Resolution No. 07, Series of 2010, Resolution Amending the Rules for the Default Wholesale Supply (DWS) Arrangements for the Wholesale Electricity Spot market (WESM) in the Luzon Grid, as Amended (3/11/2010)
4. Resolution No. 05, Series of 2010, Resolution Adopting the Distribution Management Committee (DMC) Significant Incident Reporting Procedures (3/11/2010)
5. Resolution No. 04, Series of 2010, A Resolution Setting the Installed Generating Capacity Per Grid, National Grid and the Market Share Limitations per Grid and the National Grid for 2010 (3/11/2010)
6. Resolution No. 03, Series of 2010, Rules for the Registration of Wholesale Aggregators, as Amended (3/9/2010)
7. Resolution No. 02, Series of 2010, A Resolution Adopting the Amendments to the Distribution Services and Open Access Rules (DSOAR) (3/4/2010)
8. Resolution No. 01, Series of 2010, A Resolution Adopting the Rules for the Power Supply Option Program (PSOP) (1/25/2010)
 
RULES & REGULATIONS
1. A Resolution Adopting the Rules to Govern the Interruptible Load Program (ILP) of Distribution Utilities (DUs) (3/15/2010)
2. Resolution No. 06, Series of 2010, A Resolution Directing All Distribution Utilities to Remit their Respective Proportionate Shares to the Distribution Management Committee’s 2010 Budget (3/11/2010)
3. Resolution No. 07, Series of 2010, Resolution Amending the Rules for the Default Wholesale Supply (DWS) Arrangements for the Wholesale Electricity Spot market (WESM) in the Luzon Grid, as Amended (3/11/2010)
4. Resolution No. 05, Series of 2010, Resolution Adopting the Distribution Management Committee (DMC) Significant Incident Reporting Procedures (3/11/2010)
5. Resolution No. 04, Series of 2010, A Resolution Setting the Installed Generating Capacity Per Grid, National Grid and the Market Share Limitations per Grid and the National Grid for 2010 (3/11/2010)
6. Resolution No. 03, Series of 2010, Rules for the Registration of Wholesale Aggregators, as Amended (3/9/2010)
7. Resolution No. 02, Series of 2010, A Resolution Adopting the Amendments to the Distribution Services and Open Access Rules (DSOAR) (3/4/2010)
8. Resolution No. 01, Series of 2010, A Resolution Adopting the Rules for the Power Supply Option Program (PSOP) (1/25/2010)


DECISIONS & ORDERS
DECISIONS 
1. Decision, ERC Case No. 2009-108 MC, In the Matter of Violation of ERC Orders, Rules and RegulatioDecision, ERC Case No. 2009-108 MC, In the Matter of Violation of ERC Orders, Rules and Regulations, PECO, respondentns, PECO, respondent (3/10/2010)
2. Decision, ERC Case No. 2009-064 RC, In the Matter of the Application for Approval of Over-All Tariff Adjustment, with Prayer for Issuance of Provisional Authority, BANELCO, applicant (3/10/2010)
3. Decision, ERC Case No. 2009-029 RC, In the Matter of the Application for Approval of the Ancillary Services Procurement Agreement (ASPA) Between the National Transmission Corporation (now National Grid Corporation of the Philippines) and the National Power Corporation, with Prayer for Provisional Authority, NGCP, applicant (3/10/2010)
4. Decision, ERC Case No. 2009-077 MC, In the Matter of Violation of ERC Orders, Rules and Regulations, FIBECO, respondent (3/9/2010)
5. Decision, ERC Case No. 2008-100 MC, In the Matter of the Application for Approval of Capital Projects and Authority to Secure Loans from the National Electrification Administration (NEA) in Accordance with the Provisions of R. A. No. 9136 and the Guidelines to Govern the Submission, Evaluation and Approval of Electric Capital Projects, with Prayer for Issuance of Provisional Authority, ROMELCO, applicant (3/3/2010)
6. Decision, ERC Case Nos. 2005-380 CC, 2005-381 CC, 2006-575 CC, 2006-579 CC, Quintin Canaya and Justino Tañedo, Consumers Affair Legal, Inc. et. al versus Manila Electric Company (3/3/2010)
7. Decision, ERC Case No. 2009-175 RC, In the Matter of Application for Approval of the Translation Into Distribution Related Rates of Different Customer Classes for the Second Regulatory Year of the ERC-Approved Annual Revenue Requirement for Mactan Electric Company, Inc. (MECO) Under the Performance Based Regulation (PBR) for The Regulatory Period 2009-2013, MECO applicant (3/3/2010)
8. Decision, ERC Case No. 2007-493 MC, In the Matter of the Application for the Approval of the Sale of Various Sub-transmission Lines/Assets within the Franchise Area of Davao Oriental Electric Cooperative, Inc. (DORECO), TRANSCO, applicant (3/3/2010)
9. Decision, ERC Case No. 2009-062 MC, In the Matter of the Application for the Approval of the Sale of Various Sub-transmission Lines/Assets with the Franchise Area of Bohol Light Company, Inc. (BLCI) as Covered by a Contract to Sell, TRANSCO and BLCI, applicants (3/3/2010)
10. Decision, ERC Case No. 2008-099 MC, In the Matter of the Application for Approval of Emergency Capital Projects and Authority to Secure Loans from the National Electrification Administration (NEA) in Accordance with the Provisions of R. A. No. 9136 and the Guidelines to Govern the Submission, Evaluation and Approval of Electric Capital Projects, with Prayer for Issuance of Provisional Authority, ROMELCO, applicant (3/3/2010)
11. Decision, ERC Case No. 2007-441 MC, In the Matter of the Violation of ERC Order, Rules and Regulations (VIOLATION - Late Remittance of Universal Charge Collection), BASELCO, respondent (3/1/2010)
12. Decision, ERC Case No. 2007-006 RC, In the Matter of the Application for Approval/Review of the Power Supply Agreement (PSA) and Composite Rate Structure Between Iloilo I Electric Cooperative, Inc. and PNOC-Energy Development Corporation with Prayer for Provisional Authority, ILECO I & PNOC-EDC, applicants (2/26/2010)
13. Decision, ERC Case No. 2009-075 RC, In the Matter of the Application for Approval of the Electric Power Purchase Agreement (EPPA) Between Visayan Electric Company, Inc. (VECO) and Cebu Energy Development Corporation (CEDC), With Prayer for Provisional Authority, VECO and CEDC (2/24/2010)
14. Decision, 2008-004 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Implementing Capital Projects Without Prior Approval from the Commission) CAGELCO II, respondent (2/24/2010)
15. Decision, ERC Case No. 2005-019 MC, In the Matter of Dispute Re: Violation of Franchise Area of MORESCO I by CEPALCO, MORESCO I, complainant Versus CEPALCO , respondent (2/24/2010)
16. Decision, ERC Case No. 2009-006 MC, In the Matter of the Application for the Approval of the Sale of Various Subtransmission Lines/Assets of the National Transmission Corporation (TRANSCO) to the Cebu II Electric Cooperative Inc., (CEBECO II) as Covered by a Lease of Purchase Agreement, TRANSCO and CEBECO II, applicants (2/18/2010)
17. Decision, ERC Case No. 2007-442 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Late Remittance of Universal Charge Collections), CENPELCO, respondent (2/17/2010)
18. Decision, ERC Case No. 2007-251 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Failure to Implement the ERC’s Order on PPA), LUELCO, respondent (2/17/2010)
19. Decision, ERC Case No. 2007-444 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Late Remittance of Universal Charge Collections), DORELCO, respondent (2/17/2010)
20. Decision, ERC Case No. 2009-072 MC, In the Matter of the Application for Authority to Rehabilitate and Restore the Distribution Lines Damaged by Cyclone Emong with Prayer for Provisional Authority, PANELCO I, applicant (2/16/2010)
21. Decision, ERC Case No. 2007-111 RC, In the Matter of the Application for the Approval of the Proposed Time-of-Use (TOU) Retail Rates to End-Users, with Prayer of Provisional Authority, MERALCO, applicant (2/15/2010)
22. Decision, ERC Case No. 2009-066 MC, In the Matter of the Application for Authority to Implement 2009 Major Capital Projects, with Prayer for Provisional Authority, TEI, applicant (2/15/2010)
23. Decision, ERC Case No. 2007-005 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Failure to Submit the 2005 Annual Report), LUECO, respondent (2/12/2010)
24. Decision, ERC Case No. 2009-102 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Implementing Project without Prior Approval from the Commission), NEECO II – Area 1, respondent (2/12/2010)
25. Decision, ERC Case No. 2009-079 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Operating as a Generation Company without a Certificate of Compliance (COC), Crystal Sugar Milling Company, Inc. respondent (2/12/2010)
26. Decision, ERC Case No. 2008-044 RC, In the Matter of the Application for the the Approval of Power Supply Agreement (PSA) Between Cagayan Electric Power and Light Company, Inc. and FG Bukidnon Power Corporation, CEPALCO and FGBC, applicants (2/12/2010)
27. Decision, ERC Case No. 2007-445 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Late Remittance of Universal Charge Collections), ESAMELCO, respondent (2/12/2010)
28. Decision, ERC Case No. 2008-018 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Failure to Implement the ERC;s Order on PPA), ZAMCELCO, respondent (2/12/2010)
29. Decision, ERC Case No. 2007-286 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Failure to Implement the ERC’s Order on PPA), BASELCO, respondent (2/11/2010)
30. Decision, ERC Case No. 2008-080 MC, In the Matter of the Application for Authority to Donate the Ownership of the Power Generation Sets of the Twelve (12) Energized Islands, all within the Coverage Area of BOHECO I, to the Small Power Utilities Group (SPUG) of the National Power Corporation with Prayer for Provisional Authority, BOHECO I, applicant (2/9/2010)
31. Decision, ERC Case No. 2007-447 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Late Remittance of Universal Charge (UC) Collection), KAELCO, respondent (2/5/2010)
32. Decision, ERC Case No. 2007-470 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Failure to Implement on Time the Unbundled Rates) SAMELCO I, respondent (2/5/2010)
33. Decision, ERC Case No. 2007-466 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Non-remittance of Proportionate Share in the Distribution Management Committee (DMC) SAMELCO I, respondent (2/5/2010)
34. Decision, ERC Case No. 2009-021 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Re: For Erroneously Implementing the PPA Refund Order of the Commission dated May 25, 2005), INEC, respondent (2/5/2010)
35. Decision, ERC Case No. 2007-463 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Non-remittance of Proportionate Share in the Distribution Management Committee (DMC), LEYECO I, respondent (2/4/2010)
36. Decision, ERC Case No. 2007-267 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Failure to Implement the ERC’s Order on PPA ), CANORECO, respondent (2/2/2010)
37. Decision, ERC Case No. 2007-432 CM, In the Matter of Violation of ERC Orders, Rules and Regulations (Late Remittance of Universal Charge (UC) Collections, MOELCI I, respondent (2/2/2010)
38. Decision, ERC Case No. 2007-349 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Non-inclusion of Pilferage Recoveries in PPA Computation), PENELCO, respondent (2/2/2010)
39. Decision, ERC Case Nos. 2006-112 MC, 2006-115 MC, 2007-252 MC, 2007-296 MC, In the Matter of Violation of ERC Orders, Rules and Regulations, PANELCO, respondent (2/2/2010)
40. Decision, ERC Case No. 2009-038 MC, In the Matter of the Application for the Approval of Major Capital Project - Re: Construction of 10 MVA San Jose Substation and Authority to Secure Loan Amounting to Twenty Four Million One Hundred Twenty Six Thousand Eight Hundred fifty Pesos (Php 24,126,850.00) from the National Electrification Administration (NEA), with Prayer for Provisional Authority, ZAMSURECO I, applicant (2/2/2010)
41. Decision, ERC Case No. 2009-082 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Failure to Implement the Approved Rate Reduction due to Loan Condonation), ISELCO I, respondent (2/2/2010)
42. Decision, ERC Case No. 2009-011 RC, In the Matter of the Application for Approval of the Amendment/Supplement to the Agreement for the Sale of Electric Energy (ASEE), Transmission Service Agreement (TSA) and Supplemental Memorandum of Agreement (MOA) to the NPC-MERALCO Power Supply Contract for the Power Requirements of Sunpower and the Supplemental Agreement Between Sunpower and MERALCO with Prayer for Provisional Authority, MERALCO, applicant (1/29/2010)
43. Decision, ERC Case No. 2009-081 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Wrong Implementation of Rate Reduction due to Loan Condonation, BENECO, respondent (1/25/2010)
44. Order, ERC Case No. 2009-065 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, BUSECO, applicant (1/21/2010)
45. Decision, ERC Case No. 2009-040 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Implementing Capital Projects without Prior Approval from the Commission), DLPC, respondent (1/19/2010)
46. Decision, ERC Case No. 2009-045 MC, In the Matter of Violation of ERC Order, Rules and Regulations, NORECO I, respondent (1/13/2010)
47. Decision, ERC Case No. 2008-057 RC, In the Matter of the Application for Approval of the Power Supply Agreement Between VMC Rural Electric Services Cooperative, Inc. and San Carlos Bioenergy, Inc. with Prayer for Provisional Authority, VRESCO and SCBI, applicants (1/12/2010)
ORDERS
1. Order, ERC Case No. 2009-180 RC, In the Matter of the Application for the Approval of the Maximum Annual Revenue for the Third Regulatory Period (2011 to 2015) of the National Grid Corporation of the Philippines (NGCP) During the Regulatory Reset Process for the Third Regulatory Period in Accordance with the Alternative Form of Rate Setting Methodology Under the Rules in Setting the Transmission Wheeling Rates (RTWR), NGCP, applicant (3/10/2010)
2. Order, ERC Case No. 2010-017 RC, In the Matter of the Petition for the Approval of a Lower Generation Charge for Billing Month of March 2010 and for the Recovery of the Differential Generation Charge within a Six (6) Month Period, Including the Carrying Cost, with Prayer for Provisional Authority, MERALCO, petitioner (3/10/2010)
3. Order, ERC Case No. 2006-125 MC, In the Matter of the Application for Approval of the Sale of Various Sub-Transmission Lines/Assets Within the Franchise Area of Davao Light and Power Company, Inc. (DLPC), TRANSCO, applicant (3/9/2010)
4. Order, ERC Case No. 2009-025 RC, In Re: Petition for Approval of the Power Supply Agreement (PSA) and NPP True cost Generation Rate (NPP-TCGR) with Prayer for Provisional Approval, PALECO and Delta P, applicants (3/9/2010)
5. Order, ERC Case No. 2006-115 MC, In the Matter of Violation of ERC Orders, Rules and Regulations, PANELCO III, respondent (3/8/2010)
6. Order, ERC Case No. 2006-112 MC, In the Matter of Violation of ERC Orders, Rules and Regulations, PANELCO III, respondent (3/8/2010)
7. Order, ERC Case No. 2007-359 MC, In the Matter of Violation of ERC Orders, Rules and Regulations, QUEZELCO I, respondent (3/8/2010)
8. Order, ERC Case No. 2007-294 MC, In the Matter of Violation of ERC Orders, Rules and Regulations, ISECO, respondent (3/8/2010)
9. Order, ERC Case No. 2009-080 MC, In the Matter of Violation of ERC Orders, Rules and Regulations, LPPH, respondent (3/8/2010)
10. Order, ERC Case No. 2009-078 MC, In the Matter of Violation of ERC Orders, Rules and Regulations, SORECO II, respondent (3/8/2010)
11. Order, ERC Case No. 2007-296 MC, In the Matter of Violation of ERC Orders, Rules and Regulations, PANELCO III, respondent (3/8/2010)
12. Order, ERC Case No. 2008-026 RC, In the Matter of the Petition for Approval of Interim Open Access in the Luzon and Visayas Grids, PIPPA, MERALCO, VECO, CEDC, DLPC, CEPALCO SFELAPCO & PECO, petitioners (3/3/2010)
13. Order, ERC Case No. 2001-338 (96-35) In the Matter of the Adoption of Formula for Automatic Cost Adjustment and Adoption of Restructured Rate Adjustment of the National Power Corporation (NPC) to Comply with R.A. 7832, with Prayer for Provisional Authority, BATELEC II, petitioner (3/3/2010)
14. Order, ERC Case No. 2009-032 MC, In the Matter of the Application for Direct Connection with the National Power Corporation (NPC) and the National Transmission Corporation (TRANSCO with Prayer for Provisional Authority and Issuance of a Temporary Mandatory Order and/or a Writ of Preliminary Injunction, PHI versus NPC, NGCP & MERALCO (3/1/2010)
15. Order, ERC Case No. 2007-349 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Non-inclusion of Pilferage Recoveries in PPA Computation), PENELCO, respondent (3/1/2010)
16. Order, ERC Case No. 2009-174 RC, In the Matter of the Application for the Approval of the Sale of Various Sub-transmission Lines / Assets of the National Transmission Corporation (TRANSCO) to Manila Electric Company (MERALCO) as Covered by a Contract to Sell, with Prayer for Provisional Authority, TRANSOC and MERALCO, applicants (2/25/2010)
17. Order, ERC Case No. 2009-045 MC, In the Matter of Violation of ERC Order, Rules and Regulations, NORECO I, respondent (2/23/2010)
18. Order, ERC Case No. 2009-079 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Operating as a Generation Company without a Certificate of Compliance (COC), Crystal Sugar Milling Company, Inc. respondent (2/23/2010)
19. Order, ERC Case Nos. 2007-329 MC and 2007-398 MC, In the Matter of Violation of ERC Orders, Rules and Regulations, MORESCO II, respondent (2/18/2010)
20. Order, ERC Case No. 2009-176 RC, In the Matter of the Application for Approval of the Contract for the Supply of Electric Energy Between Masinloc Power Partners Co. Ltd. and La Union Electric Cooperative, Inc. with Prayer for Provisional Authority, LUELCO and MPPCL, applicants (2/17/2010)
21. Order, ERC Case No. 2007-308 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Failure to Implement PPA Using Power Cost at “Net” of Discounts), ISECO, respondent (2/16/2010)
22. Order, ERC Case No. 2010-005 RC, In the Matter of the Application for the Approval of the Contract for the Supply of Electric Energy Between Pampanga Rural Electric Service Cooperative, Inc. (PRESCO) and Masinloc Power Partners Co., Ltd. (MPPCL), with Prayer for Provisional Authority, PRESCO and MPPCL, applicants (2/16/2010)
23. Order, ERC Case No. 2009-048 RC, In the Matter of the Application for Approval of Over-All Tariff Adjustment, with Prayer for Issuance of Provisional Authority, OMECO, applicant (2/16/2010)
24. Order, ERC Case No. 2009-004 RC, In the Matter of the Application for the Approval of the Proposed New Basic Generation Rates for Luzon, Visayas and Mindanao Grids with Prayer for Provisional Authority, NPC and PSALM, applicants (2/15/2010)
25. Order, ERC Case No. 2001-902, In the Matter of the Application for the Approval of the Unbundled Rates Pursuant to the Provisions of Republic Act No. 9136, BATELEC II, applicant (2/15/2010)
26. Order, ERC Case No. 2009-081 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Wrong Implementation of Rate Reduction due to Loan Condonation), BENECO, respondent (2/12/2010)
27. Order, ERC Case No. 2008-071 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Implementing Capital Projects Without Prior Approval from the Commission), BILECO, respondent (2/12/2010)
28. Order, ERC Case No. 2010-008 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Failure to Implement the ERC’s Order on PPA), NEECO – Area 2, respondent (2/10/2010)
29. Order, ERC Case No. 2007-257 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Failure to Implement the ERC’s Order on PPA), NEECO I, respondent (2/5/2010)
30. Order, ERC Case No. 2008-013 MC, In the Matter of Violation of ERC Orders, Rules and Regulations (Failure to Implement the ERC’s Order on PPA), ALECO, respondent (2/5/2010)
31. Order, ERC Case No. 2009-057 RC, In the Matter of the Application for Approval of: a) Maximum Average Price (MAP) for the Regulatory Year 2010; and b) Translation of the Maximum Average Price for Regulatory Year 2010 (RY2010) Into a Distribution Rate Structure for its Various Customer Classes with Prayer for the Issuance of a Provisional Authority, MERALCO applicant (2/4/2010)
32. Order, ERC Case No. 2008-019 RM, Proposed Rules for Automatic Recovery of PSALM Generation Assets Monthly Fuel, Purchased Power and Foreign Exchange Related Cost, PSALM, applicant (2/3/2010)
33. Order, ERC Case No. 2009-046 RC, In the Matter of the Petition for the Recovery of National Power Corporation's Stranded Contract Costs Portion of the Universal Charge for the Luzon Grid. PSALM, applicant (2/2/2010)
34. Order, ERC Case No. 2009-055 MC, In the Matter of the Application for Authority to Implement 2009 Major Capital Projects, with Prayer for Provisional Authority, SFELAPCO, applicant (2/2/2010)
35. Order, ERC Case No. 2009-141 RC, In the Matter of the Application for Approval of the Contract for the Supply of Electric Energy Between Masinloc Power Partners Co. Ltd. and Zambales II Electric Cooperative, Inc. with Prayer for Provisional Authority, ZAMECO II and MPPCL, applicants (1/29/2010)
36. Order, ERC Case No. 2009-173 RC, In the Matter of the Application for Approval of the Contract for the Supply of Electric Energy Between Masinloc Power Partners Co. Ltd. and Aurora Electric Cooperative, Inc. with Prayer for Provisional Authority, AURELCO and MPPCL, applicants (1/29/2010)
37. Order, ERC Case No. 2009-081 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, CASURECO I, applicant (1/28/2010)
38. Order, ERC Case No. 2009-080 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, BOHECO II, applicant (1/28/2010)
39. Order, ERC Case No. 2009-083 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, SAMELCO II, applicant (1/27/2010)
40. Order, ERC Case No. 2009-084 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, SIARELCO, applicant (1/26/2010)
41. Order, ERC Case No. 2009-079 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, PRESCO , applicant (1/26/2010)
42. Order, ERC Case No. 2009-085 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, QUEZELCO I, applicant (1/26/2010)
43. Order, ERC Case No. 2009-007 RC, In the Matter of the Application for Approval of the Ancillary Services Procurement Agreement Between the National Transmission Corporation and SN Aboittiz Power-Magat, Inc. with Prayer for Provisional Authority, TRANSCO and SN ABoitiz, applicants (1/26/2010)
44. Order, ERC Case No. 2008-107 MC, In the Matter of the Petition for Dispute Resolution, Northwind, petitioner versus INEC, respondent (1/25/2010)
45. Order, ERC Case No. 2009-071 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, CEBECO III, applicant (1/25/2010)
46. Order, ERC Case No. 2009-022 RC, In the Matter of the Application for Approval of (1) Sound Value Appraisal of Applicant's Assets as of 31 December 2006 Including Additions and Retirements for the Years 2007 and 2008; and (2) Revision of Rates to Achieve the Proposed Revenue Requirement in Accordance with the Provisions of R.A. 9136, with Prayer for Provisional Authority, TEI, applicant (1/25/2010)
47. Order, ERC Case No. 2008-066 RC, In the Matter of the Application for the Approval of Connection Charge and Residual Subtransmission Charges for Calendar Year 2008 on the Excluded Services Covering the Existing Subtransmission Assets of the National Transmission Corporation (TRANSCO) and Any Future Concessionaire Thereof, with Prayer for Provisional Authority, TRANSCO, applicant (1/25/2010)
48. Order, ERC Case No. 2009-160 RC, IN the Matter of the Application for the National Grid Corporation of the Philippines for the Approval of the Maximum Allowable Revenue (MAR) for Calendar Year 2010 in Accordance with the Alternative Form of Rate Setting Methodology under the Rule for Setting Transmission Wheeling Rates (RTWR) with Prayer for Provisional Authority, NGCP, applicant (1/25/2010)
49. Order, ERC Case No. 2009-073 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, AURELCO, applicant (1/22/2010)
50. Order, ERC Case No. 2009-072 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, MORESCO II, applicant (1/22/2010)
51. Order, ERC Case No. 2009-077 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, BILECO , applicant (1/22/2010)
52. Order, ERC Case No. 2009-070 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, CEBECO I, applicant (1/21/2010)
53. Order, ERC Case No. 2009-069 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, CEBECO II, applicant (1/21/2010)
54. Order, ERC Case No. 2009-068 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, FIBECO, applicant (1/20/2010)
55. Order, ERC Case No. 2006-079 RC, In the Matter of the Joint Application for Approval of the Transition Supply Contract Between National Power Corporation and Manila Electric Company, with Prayer for Provisional Authority, MERALCO and NPC, applicants (1/20/2010)
56. Order, ERC Case No. 2009-082 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, ZAMSURECO I, applicant (1/20/2010)
57. Order, ERC Case No. 2009-086 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, PELCO II, applicant (1/20/2010)
58. Order, ERC Case No. 2009-076 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, CAGELCO I, applicant (1/20/2010)
59. Order, ERC Case No. 2009-066 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, PELCO I, applicant (1/18/2010)
60. Order, ERC Case No. 2009-103 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, CAMELCO, applicant (1/18/2010)
61. Order, ERC Case No. 2009-130 RC, In the Matter of the Application for Approval of the Implementation of the Rules for Setting Electric Cooperatives' Wheeling Rates (RSEC-WR) with Prayer for Provisional Authority, GUIMELCO, applicant (1/18/2010)
62. Order, ERC Case No. 2009-013 RC, In the Matter of the Urgent Request for Approval of the Agreement on the Interim Rate Between Visayan Electric Company, Inc. and Toledo Power Company, with Prayer for Provisional Authority, VECO & TPC applicants (1/12/2010)
63. Order, ERC Case No. 2009-027 MC, In the Matter of Violation of ERC Order, Rules and Regulations, LEYECO V, respondent (1/12/2010)
64. Order, ERC Case Nos. 2007-298 MC and 2007-357 MC, In the Matter of Violation of ERC Order, Rules and Regulations, ORMECO, respondent (1/8/2010)
65. Order, ERC Case No. 2009-010 RC, In the Matter of the Urgent Request for Approval of the Agreement on the Interim Rate Between Cebu III Electric Cooperative Inc. and Toledo Power Company, with Prayer for Provisional Authority, CEBECO III & TPC, applicants (1/8/2010)
66. Order, ERC Case No. 2009-034 MC, In the Matter of Violation of ERC Order, Rules and Regulations, SOCOTECO I, respondent (1/7/2010)
67. Order, ERC Case No. 2008-101 MC, Dispute Resolution on the Purchase of TRANSCO Sub-transmission Lines, CAMELCO versus TRANSCO & MORESCO II (1/7/2010)