Initial Order, ERC Case No. 2016-030 MC, In the Matter of the Application for Authority to Develop and Own or Operate Dedicated Point to Point Limited Transmission Facilities to Connect the 25 MW DC Biliran Solar Power Project to the Visayas Grid Through the Lemon - Biliran 69 KV Line of the National Grid Corporation of the Philippines (NGCP), with Prayer for Provisional Authority, E & P Green Energy, Inc. (EPGEI) applicant
Date Docketed:3/20/2017
Published: 3/20/2017


Initial Order, ERC Case No. 2016-039 MC, In the Matter of the Application for Authority to Develop and Own or Operate Dedicated Point to Point Limited Transmission Facilities to Connect the 650 MW Combined Cycle Gas - Fired Power Plant to the New Pagbilao Substation of National Grid Corporation of the Philippine with Prayer for Provisional Authority, Energy World Power Operations Philippines, Inc. (EWPOPI) applicant
Date Docketed:3/2/2017
Published: 3/2/2017


Initial Order, ERC Case No. 2016-197 RC, In the Matter of the Application for the Approval of the Implementation of Capital Expenditure Program for Calendar Years 2017-2020, with Prayer for the Issuance of Provisional Authority, National Grid Corporation of the Philippines (NGCP) applicant
Date Docketed:3/1/2017
Published: 3/1/2017



Initial Order, ERC Case No. 2016-206 RC, In the Matter of the Application for the Approval of the Sale of the Mactan Load - End Substation of the National Transmission Corporation (TRANSCO) to Mactan Electric Company, Inc. (MECO), as Covered by a Contract to Sell dated 23 December 2015, National Transmission Corporation (TRANSCO) and Mactan Electric Company, Inc. (MECO) applicants
Date Docketed:3/1/2017
Published: 3/1/2017


Initial Order, ERC Case No. 2016-007 DR, In the Matter of the Petition for Dispute Resolution with Motion for Issuance of a Cease and Desist Order, San Carlos Sun Power, Inc. (SACASUN) petitioner versus National Grid Corporation of the Philippines (NGCP) respondent
Date Docketed:2/14/2017
Published: 2/14/2017


Initial Order, ERC Case No. 2016-039 MC, In the Matter of the Application for Authority to Develop and Own or Operate Dedicated Point to Point Limited Transmission Facilities to Connect the 650 MW Combined Cycle Gas - Fired Power Plant to the New Pagbilao Substation of National Grid Corporation of the Philippine with Prayer for Provisional Authority, Energy World Power Operations Philippines, Inc. (EWPOPI) applicant
Date Docketed:2/6/2017
Published: 2/6/2017



Decision, ERC Case No. 2015-078 RC, In the Matter of the Application for the Approval of the Pagbilao EHV Substation Project, with Prayer for the Issuance of a Provisional Authority, National Grid Corporation of the Philippines (NGCP) applicant
Date Docketed:1/25/2017
Published: 1/25/2017


Decision, ERC Case No. 2014-114 MC, In the Matter of the Application for Authority to Own, Operate, and Maintain a Dedicated Point to Point Limited Transmission Facility to Connect to the Salong Switching Station in Brgy. Salong, Calaca, Batangas, South Luzon Thermal Energy Corporation (SLTEC) applicant
Date Docketed:1/16/2017
Published: 1/16/2017


Decision, ERC Case No. 2014-113 MC, In the Matter of the Application for Authority to Develop, Own and Operate Dedicated Point-to-Point Limited Transmission Facilities to Connect Phase II of the Sarangani Energy Corporation Power Station o the General Santos Substation of the National Grid Corporation of the Philippines, with Prayer for Provisional Authority, Sarangani Energy Corporation (SEC) applicant
Date Docketed:1/10/2017
Published: 1/10/2017



Order, ERC Case No. 2007-490 MC, In the Matter of the Applicant for the Approval of the Sale of Sub-transmission Lines/Assets within the Franchise Area of Mactan Electric Company, Inc. (MECO), National Transmission Corporation (TRANSCO) applicant
Date Docketed:1/10/2017
Published: 1/10/2017

12

PROMULGATED RULES

ERC APPROVED ASPA CONTRACTS BETWEEN AS PROVIDER AND NGCP

 TRANSMISSION SECTOR

Transmission Sector. The transmission of electric power shall be a regulated common electricity carrier business subject to the ratemaking powers of the ERC. (Sec. 7, RA 9136)

Creation of the National Transmission Company. The TRANSCO shall assume the authority of NPC for the planning, construction and centralized operation and maintenace of its high voltage transmission facilities, including grid interconnections and ancillary services. (Sec. 8, RA 9136)