Promulgated Rules, Decisions and Orders




Decision, ERC Case No. 2017-079 RC, In the Matter of the Application for Approval of the Feed-in-Tariff Allowance for Calendar Year 2018 Pursuant to the Guidelines for the Collection of the Feed-in-Tariff Allowance and Disbursement of the Feed-in-Tariff Allowance Fund, with Prayer for Provisional Authority, National Transmission Corporation (TRANSCO) applicant
Date Docketed:3/29/2019
Published: 3/29/2019



Order, ERC Case No. 2013 – 195 RC, Petition for True-Up Adjustments for the National Power Corporation's Stranded Debts Portion of the Universal Charge for the Luzon, Visayas and Mindanao Grids for Calendar Years 2011 and 2012, with Prayer for the Issuance of Provisional Authority (PA), Power Sector Assets and Liabilities Management Corporation (PSALM) applicant
Date Docketed:3/28/2019
Published: 3/28/2019


Resolution No. 02, Series of 2019, A Resolution Extending the Setting of the 2019 Installed Generating Capacity and Market Share Limitation Per Grid and the National Grid
Date Docketed:3/28/2019
Published: 3/28/2019



Initial Order, ERC Case No. 2019-004 RC, In the Matter of the Petition for the Approval of the Recovery / Refund from the Universal Charge of the Shortfall/Surplus in the Missionary Electrification Subsidy for CY 2016 and the Corresponding Adjustment of the Universal Charge for Missionary Electrification (UC-ME), with Prayer of the Issuance of Provisional Authority (PA), National Power Corporation (NPC) applicant
Date Docketed:3/27/2019
Published: 3/27/2019


Initial Order, ERC Case No. 2019-003 MC, In the Matter of the Application for the Approval of SMC Consolidated Power Corporation (SCPC) 1.) Business Separation and Unbundling Plan (BSUP) and 2.) Accounting and Cost Allocation Manual (ACAM) In Compliance with Republic Act No. 9136 and its Implementing Rules and Regulations, SMC Consolidated Power Corporation (SCPC) applicant
Date Docketed:3/18/2019
Published: 3/18/2019



Order, ERC Case No. 2011-002 RM, In the Matter of the Joint Petition for the Adoption of Proposed Guidelines for an Incentive Scheme to Lower System Losses of Distribution Utilities, Private Electric Power Operators Association, Inc. (PEPOA), Philippine Rural Electric Cooperative Association, Inc. (PHILRECA) and Manila Electric Company (MERALCO) applicants
Date Docketed:3/14/2019
Published: 3/14/2019



Initial Order, ERC Case No. 2019-001 DR, In the Matter of the Petition for Full Recovery for Approved Costs in ERC Case No. 2011-030 RC Through Re-Computation of Approved Rate, Catanduanes Power Generation, Inc. (CPGI) petitioner versus First Catanduanes Electric Cooperative, Inc. (FICELCO) and National Power Corporation (NPC), respondents
Date Docketed:3/13/2019
Published: 3/13/2019


Order, ERC Case No. 2015-208 RC, In the Matter of the Application for Authorization to Provide Electricity Service in Barangay Liminangcong, Taytay, Palawan, as Qualified Third Party (QTP) and for Issuance of the Corresponding Authority to Operate (ATO) and for Approval of the QTP Service and Subsidy Contract (QSSC), with National Power Corporation (NPC), with Prayer for Issuance of a Provisional Authority (PA), PowerSource Philippines, Inc. applicant
Date Docketed:3/12/2019
Published: 3/12/2019


Initial Order, ERC Case No. 2019-001 MC, In the Matter of the Application for Authority to Develop, Own, and Operate Dedicated Point - to - Point Limited Facilities to Connect the Palayan Binary Power Plant Project to the Luzon Grid, with Prayer for Provisional Authority, Bac Man Geothermal, Inc. (BGI) applicant
Date Docketed:2/19/2019
Published: 2/19/2019




Order, ERC Case No. 2017-033 CC, Batangas Paper Corporation, complainant versus Manila Electric Company (MERALCO) and GN Power Limited Company (GNPower) respondents
Date Docketed:1/14/2019
Published: 1/14/2019

12

CERTIFICATE OF COMPLIANCE

Checklist of Requirements for COC Application Self Generation (SGF) with aggregate installed capacity below 1MW

Checklist of Requirements for COC Application Self Generation (SGF) with total installed capacity 1MW & above

Checklist of Requirements for new COC Application Independent Power Producer (IPP) Interim Mindanao Electricity Market (IMEM)

Checklist of Requirements for new COC Application SGF conversion to IPP Interim Mindanao Electricity Market (IMEM)

Checklist of Requirements for Qualified End-User COC Application

Checklist of Requirements for Amendment of COC (Application For Amendment of COC, Form 1 - 1 of 2, 2 of 2)

REQUIREMENTS AND PROCEDURES


WHOLESALE ELECTRICITY SPOT MARKET

1. About WESM

2. Market Monitoring Reports

  • 2017
    • Weekly Market Update

3. Summary of Comments on the Proposed Amendments to the Secondary Cap Scheme in the WESM

4. Resolution No. 06, Series of 2009, A Resolution Adopting the Rules for the Distribution of Net Settlement Surplus (3/13/2009)

5. WESM Rules

6. Forms for Metering Service Providers

 GENERATION SECTOR

Generation Sector. Generation of electric power, a business affected with public interest, shall be competitive and open. (Sec. 6, RA 9136)

Generation Company refers to any person or entity authorized by the ERC to operate facilities used in the generation of electricity. (Sec 4 x, RA 9136)

Generation of Electricity refers to the production of electricity by a generation company or a co-generation facility pursuant to the provisions of this Act. (Sec 4 y, RA 9136)

ANNOUNCEMENTS

Online Certificate Of Compliance (COC) Filing is now on Soft-Launch. please click here.


© 2019 - Energy Regulatory Commission