Initial Order, ERC Case No. 2019-027 RC, In the Matter of the Application for Authority to Provide Electricity Service in the Islands of Lahuy and Haponan in Caramoan, and Quinalasag in Garchitorena in the Province of Camarines Sur as a Qualified Third Party, for the Issuance of the Corresponding Authority to Operate and for Approval of the Qualified Third Party Service and Subsidy Contract with the National Power Corporation, with Prayer for Provisional Authority, FP Island Energy Corporation (FP Island) applicant
Date Docketed:6/10/2019
Published: 6/10/2019



Initial Order, ERC Case No. 2019-002 DR, In the Matter of Dispute Resolution on the Competitive Selection Process for the Supply of 300 MW Aggregated Baseload Demand of Electric Cooperatives in Central Luzon, with prayer for Temporary Restraining Order and/or Writ of Preliminary Injunction, GNPower Dinginin Ltd. Co. (GNPD) petitioner
Date Docketed:6/10/2019
Published: 6/10/2019


Order, ERC Case No. 2018-006 RM, In the Matter of the Petition for the Adoption of the Proposed Rules to Allow the Pass-Through of Real Property Tax (RPT), Philippine Rural Electric Cooperatives Association Inc. (PHILRECA) applicant
Date Docketed:6/10/2019
Published: 6/10/2019


Initial Order, ERC Case No. 2019-028 RC, In the Matter f the Application for Approval in Rates Based on the Fourth to Sixth Regulatory Years of the First Regulatory Period for Third Entrant Electric Cooperatives Under the Tariff Glide Path (TGP) Rules, Southern Leyte Electric Cooperative, Inc. (SOLECO) applicant
Date Docketed:6/7/2019
Published: 6/7/2019


Initial Order, ERC Case No. 2019-036 RC, In the Matter of the Application for Approval of the Capital Expenditure Program from Regulatory Years 2019 and 2020, Tarlac Electric Inc. (TEI) applicant
Date Docketed:6/7/2019
Published: 6/7/2019


Initial Order, ERC Case No. 2019-038 RC, In the Matter of the Application for Approval of the Power Purchase and Sale Agreement Between Iloilo III Electric Cooperative, Inc. and GNPower Mariveles Coal Plant Ltd. Co. with Motion for Confidential Treatment of Information and the Issuance of Provisional Authority, Iloilo III Electric Cooperative Inc. (ILECO III) and GNPower Mariveles Coal Plant (GMCP) applicants
Date Docketed:6/7/2019
Published: 6/7/2019


Initial Order, ERC Case No. 2019-007 MC, In the Matter of the Application for Authority to Develop and Own Dedicated Point - to - Point Limited Transmission Facilities to Connect a 15 MW Biomass Power Plant to the Gamu - Roxas 69 kV Transmission Line with Prayer for the Provisional Authority, Cagayan Biomass Energy Corporation (CBEC) applicant
Date Docketed:6/4/2019
Published: 6/4/2019


Initial Order, ERC Case No. 2019-011 MC, In the Matter of the Application for Authority to Develop, Own and Operate Dedicated Point to Point Limited Transmission Facilities (Dedicated Limited Express Feeder Line) to Connect the 8.0 MW Diesel - Fired Power Plant (DPP) to the Tawi-tawi Electric Cooperative, Inc. 13.2 KV Load Center, with Prayer for Provisional Authority, Kaltimex Rural Energy Corporation (KREC) applicant
Date Docketed:6/4/2019
Published: 6/4/2019


Initial Order, ERC Case No. 2019-009 MC, In the Matter of the Application for Approval of Business Separation and Unbundling Plan (BSUP) Pursuant to Section 36 of Republic Act 9136 and Rule 10 of its Implementing Rules and Regulations, Lubang Electric Cooperative, Inc. (LUBELCO) applicant
Date Docketed:6/4/2019
Published: 6/4/2019


Initial Order, ERC Case No. 2019-034 RC, In the Matter of the Application for Approval of Capital Expenditure Project, Re: Commissioning of San Narciso 5 MVA Substation with Feeder Conductor Enhancements, with Motion for Provisional Authority, Quezon I Electric Cooperative, Inc. (QUEZELCO I) applicant
Date Docketed:5/31/2019
Published: 5/31/2019

12345678910...>>

Issuances

A compilation of ERC guidelines, rules, regulations, procedures, decisions, orders and resolutions. For other issuances not included in this section, please contact the Office of General Counsel and Secretariat at tel. no. (02) 631-5806, E-mail: ogcs@erc.gov.ph

Today at ERC
Tuesday, June 18, 2019

Hearing Schedules
Time:
10:00
Case No.:
2019-008 MC [JU] [EX] [PT] [EV]
Applicant:
RSC
Venue:
ERC Hearing Room (15th floor)
Title:
In the Matter of the Application for the Adoption of the Same Billing Methodology Using Coincident Peak Demand (CPD) in the Calculations of Transmission Charges, as Approved for SKK Steel Corporation, Stronghold Steel Corporation and Melters Steel Corporation, with Prayer for Provisional Authority or Interim Relief