Order, ERC Case No. 2011-017 RC, In the Matter of the Application for Approval of the Power Supply Agreement (PSA) Between Oriental Mindoro Electric Cooperative, Inc. and Ormin Power, Incorporated, with Prayer for the Issuance of Provisional Authority, Oriental Mindoro Electric Cooperative, Inc. (ORMECO) applicant
Date Docketed:12/6/2018
Published: 12/6/2018


Order, ERC Case No. 2018-097 RC, In the Matter of the Joint Application for the Approval of the Power Supply Agreement (PSA) Between Pampanga II Electric Cooperative, Inc. (PELCO II) and Bacman Geothermal, Inc. (BGI), with Prayer for Provisional Authority, Pampanga II Electric Cooperative, Inc. (PELCO II) and Bacman Geothermal, Inc. (BGI) applicants
Date Docketed:12/6/2018
Published: 12/6/2018



Order, ERC Case No. 2018-005 RM, In the Matter of the Petition for the Approval of Amended Ancillary Services - Costs Recovery Mechanism, National Grid Corporation of the Philippines (NGCP) applicant
Date Docketed:12/4/2018
Published: 12/4/2018


Initial Order, ERC Case No. 2018-096 RC, In the Matter of the Application for the Approval of Adjustment in Rates Based on the Tariff Glide Path for the Fourth to Sixth Regulatory Years of the First Regulatory Period (TGP-B) Covering Years 2014-2016 for the First Entrant Group, with Motion for Provisional Authority, Leyte II Electric Cooperative, Inc. (LEYECO II) applicant
Date Docketed:11/26/2018
Published: 11/26/2018


Order, ERC Case No. 2016-173 RC, In the Matter of the Application for the Approval of Emergency Capital Project, Installation of New 10-MVA, 69/13.2KV Substation at Brgy. Salman, Ampatuan, Maguindanao for the Year 2016 with Prayer for Provisional Authority, Maguindanao Electric Cooperative, Inc. (MAGELCO) applicant
Date Docketed:11/26/2018
Published: 11/26/2018



Order, ERC Case No. 2014-102 RC, In the Matter of the Application for Approval of the Power Supply Agreement Between Occidental Mindoro Electric Cooperative, Inc. (OMECO) and Emerging Power, Inc. (EPI), with Prayer for Provisional Authority, Occidental Mindoro Electric Cooperative, Inc. (OMECO) and Emerging Power, Inc. (EPI) applicants
Date Docketed:11/23/2018
Published: 11/23/2018




Order, ERC Case No. 2018-007 RM, In the Matter of Adoption of the Amendments to Resolution No. 10, Series of 2012, Entitled "A Resolution Approving the Feed - In Tariff (FIT) Rates", Particularly for Run - Of - River Hydropower (ROR Hydro) and Biomass Fit Rates, as Necessitated by the Review and Re-Adjustment of the ROR Hydro and Biomass Fit Rates Since the Installation Targets for ROR Hydro and Biomass Technologies Have Been Extended by the Department of Energy (DOE)
Date Docketed:11/23/2018
Published: 11/23/2018


Initial Order, ERC Case No. 2018-095 RC, In the Matter of the Application for Confirmation of Force Majeure Event Capital Expenditure Project, Re: Replacement of Utilized Distribution Line Materials and Equipment, Service Drop Wires and KWH Meters; Replacement of SF6 Breaker, Office Facilities, Furnitures and Equipment, and Construction of New Main Office Building Due to Damage Caused by Tropical Depression Auring and 6.7 Magnitude Earthquake, Surigao Del Norte Electric Cooperative, Inc. (SURNECO) applicant
Date Docketed:11/21/2018
Published: 11/21/2018


Initial Order, ERC Case No. 2018-013 MC, In the Matter of the Application for Authority to Develop, Own and / or Operate Dedicated Point - to - Point Limited Facilities to Connect the 19-.99 MW Biomass Power Plant to the Cadiz - San Carlos 69 KV Line, with Prayer for Provisional Authority, San Carlos Biopower Inc. (SCBP) applicant
Date Docketed:11/21/2018
Published: 11/21/2018


Initial Order, ERC Case No. 2018-100 RC, In the Matter of the Application of the National Grid Corporation of the Philippines for the Approval of Force Majeure (FM) Event Regulated FM Pass Through for the Bombing / Sabotage Incidents in Mindanao and Luzon, and Lightning/Thunder Incident in Luzon in Accordance with the Rules for Setting Transmission Wheeling Rates with Prayer for Provisional Authority, National Grid Corporation of the Philippines (NGCP) applicant
Date Docketed:11/15/2018
Published: 11/15/2018

12345678910...>>

Issuances

A compilation of ERC guidelines, rules, regulations, procedures, decisions, orders and resolutions. For other issuances not included in this section, please contact the Office of General Counsel and Secretariat at tel. no. (02) 631-5806, E-mail: ogcs@erc.gov.ph

Today at ERC
Wednesday, December 19, 2018

Hearing Schedules
No Hearing!

© 2018 - Energy Regulatory Commission